Forum quick links
polymer foam recycle content
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by severine secret on
What is the pre and post-consumer recycled content of furniture foam? (polymer). Is there an industry standard like MDF or steel?
European testing methods for US projects
NC-v4 EQc2:Low-emitting materialsposted by Kavita K on
Can US projects use products which show compliance with VOC emissions requirement through AgBB (European) testing? Or does it need to be CDPH only.
Documenting Option 2 Prescriptive Compliance
CI-v4 EAp2:Minimum energy performanceposted by Michelle Rosenberger on
We are seeing no requirement to document the ASHRAE compliance portion of the Prescriptive requirements.
Proposed Model U-Values
NC-v4 EAp2:Minimum energy performanceposted by Trey Randolph on
I have a college dormitory with 4" face brick, R7.5 ci, 6" metal stud on 16" centers, r19 closed cell spray foam and 5/8" gypsum. Per 90.1 Table A3.3 my u-value would be 0.06.
Trane Trace Reports
NC-v4 EAp2:Minimum energy performanceposted by Ciaran McCabe on
FPL OnCall in South Florida
NC-v4 EAc4:Demand responseposted by Joseph Snider on
In South Florida, our local utility, Florida Power & Light (FPL), has a program call Business On Call. They set it up so they can turn off your A/C for short periods of time..."up to 17.5
Approved Bicycle Storage
NC-v4 LTc6:Bicycle facilitiesposted by Summer Minchew on
I read and understand the USGBC guidance regarding the selection of bike racks, that “Bicycle racks should reflect best practices in design and installation.
Public lavatory (restroom) faucet water sense?
CI-v4 WEp1:Indoor water use reductionposted by Carlos Dobobuto on
Hi, we are looking for a Public lavatory (restroom) faucet with water sense label but all we have found have higher consuption that the base line.
How long after a project is completed can credits be submitted?
Healthcare-v4 INc1:Innovationposted by Stephanie Kreps on
If a new construction project is already registered in LEED online, can the credit submittal process begin after the building has been completed?