Compliance to ASHRAE 90.1-2010 - Dimming Lights
CS-v4 LTc7:Reduced parking footprintposted by Summer on
I'm working on an office project located at the top of a 3-level podium and has a 4-level basement parking.
Pumps in LEED Energy Models
CI-v4 EAc2:Optimize energy performanceposted by Ciaran McCabe on
Addition to an existing airport terminal
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Ricardo Sá on
Dear All,
Monitoring-based Cx for CS projects
CS-v4 EAc1:Enhanced commissioningposted by Shannon Oletic on
What are the required measurement points for a core and shell project?
USGBC approved equivalent for ASHRAE standards
CI-v4 EAp1:Fundamental commissioning and verificationposted by Alexander Spilger on
Hi,
Enhanced Commissioning
NC-v4 EAp1:Fundamental commissioning and verificationposted by saif eddine majdaoui on
We are working on a big project, we are the LEED subcontractor (consultant) of the general contractor (All trades),
EAp1-Fundamental Commissioning and Verification - OPR / BOD
NC-v4 EAp1:Fundamental commissioning and verificationposted by Maria Peralta on
Hello, I have a question regarding the OPR and BOD documents.
LEED v4 CI EAb Opt. Energy Perf. : Option 2 : AEDG Maximum Project Size requirements
CI-v4 EAc2:Optimize energy performanceposted by Kristen Callori on
Our project is an existing 300,000 sf Office building. Our client is both the new owner and will be the sole tenant.
minor improvements within the water body body buffers: grade changes necessary to ensure public access
NC-v4 LTc2:Sensitive land protectionposted by Louise Schlatter on
Hi. I have a question about minor improvements within the water body body buffer. It says "grade changes necessary to ensure public access." We have a small First Order strea