Bike numbers for Resort
NC-v4 LTc6:Bicycle facilitiesposted by Neshat Sakeena on
I am working on a resort project located at a remote location.
Energy Model AND LEED Excel sheet required
NC-v4 EAc2:Optimize energy performanceposted by Brandon White on
Are both required to be completed? If so, one has to enter all the building information into compliant energy modeling software AND into the LEED Excel sheet? That's ridiculous.
Baseline System Selection in LEED v4
NC-v4 EAp2:Minimum energy performanceposted by Samer Hassanie on
This is in regards to Eap2 Minimum Energy Performance and Eac1 Optimized Energy Performance.
Solar PPAs and Calculating Annual Energy Cost Reductions
NC-v4 EAc2:Optimize energy performanceposted by Joshua Radoff on
All, I have a project that is looking to install a significant amount of solar PV on the roof of their commercial office project via a third party PPA arrangement.
CIBSE Narrow Plan Requirement
NC-v4 EQp1:Minimum indoor air quality performanceposted by gjn on
Hello everyone,
Gender neutral restrooms
NC-v4 WEp2:Indoor water use reductionposted by Anna Kaelin on
My project only has two water closets, one is back-of-house for employees only and one is for customers. Both are gender neutral.
Option 1 Requirements
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Yodi Danusastro on
Do we have to meet all the requirement in Option 1 as in mechanically ventilated spaces: A.the Entryway system strategy, B. Interior-cross-contamination prevention, and C.
Other Buildings within LEED Boundary
NC-v4 SSc5:Heat island reductionposted by Max Krueger on
Should other buildings within the LEED boundary be counted towards this credit? These existing buildings will not be getting certified.
Reverberation Calculations for a Library - Option 2
Schools-NC-v4 EQp3:Minimum acoustic performanceposted by Gwenedd Murray on
We have a library that is roughly 40,000cf which requires us to determine maximum reverberation from NRC-CNRC Construction Technology Update No.
Option 2: Inputting Direct and Diffuse Horizontal Irradiance in IES
NC-v4 EQc7:Daylightposted by on
I'm working in IES to evaluate the daylight LEED credit option 2 for a project, and one of the requirements is to input direct and diffuse horizontal irradiance.