Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

only 2 subsystems required?

CS-v4 WEc4:Water metering
posted by  Jens Apel  on 

I just want to make sure that it is sufficient to meter 2 subsystems; not all that are available in a project.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7783 thumbs up
Mon Feb 25, 2019, 3:25 pm

Restaurant for office emloyees only

NC-v4 LTc6:Bicycle facilities
posted by  Sandra Holmström  on 

The Project has a restaurant that is for office-employees only - can the transients be counted as 0 if the restaurant only will be used by employees?

1
Mon Feb 25, 2019, 3:16 pm

average daily visitors

NC-v4 LTc6:Bicycle facilities
posted by  Sandra Holmström  on 

I would like to know how to calculate average daily visitors. Should it be 11 or 99 average Daily visitors?

0

Modeling Microturbines in EnergyPro

NC-v4 EAc2:Optimize energy performance
posted by  Joel Embury  on 

I'm working on a 5 story hotel in San Jose, Ca.  The project is considering adding Microturbines.  Has anyone modeled these in EnergyPro?  If so, are they modeled in a similar manner

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Thu Feb 21, 2019, 10:22 pm

CBE Tool

NC-v4 EQc5:Thermal comfort
posted by  Sara Hickman  on 

Does V4 still allow the CBE tool as a form of documentation for LO?

3
Sustainability Director
Retail Design Collaborative + Studio One Eleven
LEEDuser Basic Member
1 thumbs up
Thu Feb 21, 2019, 9:51 pm

DOAS & VRF for LEED in EnergyPro

NC-v4 EAc2:Optimize energy performance
posted by  Joel Embury  on 

I’ve been working on a LEED project with VRF & DOAS in San Jose, CA.  For the LEED Energy Model, EnergySoft suggested attaching the DOAS to 10 sq. ft.

1
Fri Mar 8, 2019, 5:02 pm

Outdoor Space

NC-v4 SSc3:Open space
posted by  Daniela Carrillo Lopez  on 

Would a picnic area with tables and chairs fulfill "a pedestrian-oriented paving or turf area with physical site elements that accommodate outdoor social activities"?

1
Thu Feb 21, 2019, 9:58 pm

v4 compliant non-shrink non-metallic grout?

NC-v4 EQc2:Low-emitting materials
posted by  Laura Charlier  on 

Has anyone come across a v4 compliant non-shrink, non-metallic structural grout that meets ASTM C 1107?

0

EPD without program operator and/or specific PCR

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Paula Rantanen  on 

Hi all. Does anyone know whether it is required that an EPD must contain information about the Program Operator and the specific PCR that has been followed when conducting the LCA?

4
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Thu Feb 21, 2019, 6:21 pm

Are Parking areas for Buses and Taxis included in Option 2

NC-v4 SSc5:Heat island reduction
posted by  Stephan Zweig  on 

Hello to all,

Do you  have any suggestion if I have to include for Option 2 of heat island  reduction credit the following:

1) Parking lots for Buses?

1
Wed Mar 13, 2019, 1:31 am