Forum quick links
Structure and Enclosure
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Jon Clifford on
A discussion on the BPDO-EPD forum (http://www.leeduser.com/comment/redirect/66396) has started me thinking about how to treat materials that could fall on a Credit tipping point depending on wheth
Campus cooling towers
CS-v4 WEc3:Cooling tower water useposted by Ted Kussow on
The building being designed is to be connected to a campus cooling system with cooling towers. Can we get this credit if the campus cooling towers meet the requirements?
Which part of a toilet need water label?
CI-v4 WEp1:Indoor water use reductionposted by Katarzyna Toczynska on
Hi,
we're just deciding on water fixtures on our project and have some trouble with choosing water closets. Our toilets consist of:
- a separate bowl
Number of Bicycle Racks and Changing/shower facilities
CS-v4 LTc6:Bicycle facilitiesposted by LEED Pro Consultant on
We are currently working on a CS building of 146,617 sqm. The calculations according to the Reference Guide requirements, result in 734 racks and 99 shower/changing facilities.
SSc6
EBOM-v4 SSc6:Site improvement planposted by Yaretzy Charo on
What does it mean by documentation of existing site conditions?
Commerical Kitchen Equipment - App.3 requirements
Retail-CI-v4 EAp2:Minimum energy performanceposted by Linda Davisson on
We have a Market space fit-out that has multiple tenants within the this market space (multiple food vendors and restaurants).
LEED for Homes: Midrise Floor Storey limit
Mid-Rise-v4 MPR3:Must comply with project size requirementsposted by Tim Nabholz on
I have a project that is looking at pursuing a LEED certification. The project is a 23 storey residential facility and was wondering if LEED for Homes: Midrise could be pursued.
air cooled chiller minimum full load efficiency COP according to LEED
NC-v4 EAp2:Minimum energy performanceposted by shamim uddin on
Please I am looking for the air cooled chiller minimum full load efficiency COP according to LEED.
Electric Showers
NC-v4 WEp2:Indoor water use reductionposted by Cathal Heneghan on
Hi all
How do we evaluate electric showers since their flow rate will vary on water temperature?