Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Reclaimed land from sea

NC-v4 MPR1:Must be in a permanent location on existing land
posted by  Bazeeth Ahamed K M  on 

"All LEED projects must be constructed and operated on a permanent location on existing land" So reclaimed land from sea(artificial island) would not be eligible for LEED V 4 as they are not existi

4
Founder & Community Director
Metricorps
LEEDuser Expert
7783 thumbs up
Wed Aug 8, 2018, 3:18 pm

Strategy to fulfill the pilot credit Quality views in non regularly occupied spaces

NC-v4 EQc8:Quality views
posted by  Angela Atehortua  on 

In a Project that we are advising that consists of an Innovation building for a University, we are aiming to achieve this pilot loan by implementing two main strategies, the first is that all space

1
Wed Aug 8, 2018, 2:38 pm

Exceptions for museums?

NC-v4 EAp2:Minimum energy performance
posted by  Michelle Smith  on 

We have a 8,335 sq. ft. historic building which is being renovated to accommodate several small natural history collections which require specific humidity and temperature set points.

1
Wed Aug 8, 2018, 3:50 pm

waste materials such as fly ash -coal and sugar cane based - to replace cement .

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Ajaye Jogoo  on 

We shall appreciate if you could provide us with leed assessment on the above .

We use an emulsifier tested as PH7 to replace a carbon burn out using fossil fuel . 

1
Mon Oct 15, 2018, 8:01 pm

Regional Prioroty credit RPc1

NC-v4 RPc1:Regional priority
posted by  Randall Beatty  on 

What is available under EAc1 for a regional priority credit for Fort Huachuca, Arizona?

1
Mon Oct 15, 2018, 8:02 pm
2
Sustainable Design Lead
CannonDesign
LEEDuser Expert
378 thumbs up
Tue Aug 7, 2018, 2:36 pm

Community outreach and involvement

NC-v4 INc1:Innovation
posted by  Gera Feigon  on 

I am working on a New Construction project that is considering pursuing an ID point for Community outreach and involvement.  Looking at the language posted on the innovation catalog (http

2
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
470 thumbs up
Mon Aug 6, 2018, 7:51 pm

Long ribbon window considered for View Type 1

NC-v4 EQc8:Quality views
posted by  Khue Nguyen  on 

Out project has multiple ribbon windows along the entire perimeter walls. Is this condition eligible for View type 1? 

0

Exterior Lighting power - Non-tradable - Facades

CS-v4 EAp2:Minimum energy performance
posted by  Vassil Vassilev  on 

Greetings,

There is a question about the non-tradable surfaces of the exterior lighting, specifically Facades lighting.

3
Mon Aug 6, 2018, 1:19 pm