Forum quick links
Could you confirm the attached cd/m2 results?
NC-v4 EQc6:Interior lightingposted by SSN Energy Model on
Hi,
Greeting!
Achieving the certified level to earn RP credit points?
NC-v4 RPc1:Regional priorityposted by Manuelle Croft on
With the LEED Canada 2009 versions, projects had to achieve the certified level prior to ean the Regional priority credit (RPc)points.
Crosswalk with PEER?
NC-v4 INc1:Innovationposted by emily reese moody on
I have a project that is located on a campus that earned PEER certification, and the client is asking how we can incorporate that as a benefit for our project, which is fed through the energy syste
Response rate
EBOM-v4 LTc1:Alternative transportationposted by zakir hossain on
How response rate effect in calculating transportation performance score?
Option 3. design for flexibility- Acessible ceiling system
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Lara Branco on
The project I'm working on will leave all the ceiling infrastructure apparent, without the use of ceiling tiles (except a few acoustic panels). Therefore all the lighting, plumbing, etc.
View Type 3 for Private Office Space
NC-v4 EQc8:Quality viewsposted by Edgar Arevalo on
Since View Type 3 entails unobstructed views located WITHIN the distance of three times the head height of the vision glazing, can private office spaces also apply for that view type if the distanc
Storage and collection of recyclables- Size
NC-v4 MRp1:Storage and collection of recyclablesposted by Cora Kenrick on
Hello,
Can someone advise me on where i would find on how large (m2) my storage and collection area/room needs to be.
Thank you.
Airport terminal - 3 floors, less than 126,000 SF
CI-v4 EAp2:Minimum energy performanceposted by Stacey Olson on
Our system was modeled with a baseline of System 5 - Package VAV w/ Reheat, and is one system per floor.
LEED v4 Indoor Water use reduction or outdoor water use reduction
NC-v4 WEp2:Indoor water use reductionposted by Lou Niles II on
Hello I am trying to get some guidance with regard to LEED v4 and outdoor sinks.
Sinks used in outdoor spaces for office buildings or campus , maybe for the BBQ gathering area.
Lead CxA Representative appointment; Delay causing concerns... Urgent solution required!
NC-v4 EAc1:Enhanced commissioningposted by Olawale Taiwo on
Background Consideration: