Forum quick links
Product Can Count for both EPD and Material Ingredients?
CI-v4 MRc5:Building product disclosure and optimization - material ingredientsposted by Yu Zhang on
I am working on a CI project that is going for both MRc3 and MRc5. If a product happen to have EPD and one of the certificates under Material Ingredients credit, can I count it towards the 20
Extended Producer Responsibility - Same Producer, Multiple Products
CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materialsposted by Amanda Gillen on
I have several products that are specified for my project which are from the same manufacturer. For example, the same manufacturer makes the carpet and the laminate flooring.
What about Site Selection?
NC-v4 IPc1:Integrative processposted by Michelle Rosenberger on
Hi Marcus, So I'm confused. LEEDuser's preamble above indicates any project can get this credit, and you're not required to implement anything just analyze.
direct-only overhead lighting
CI-v4 EQc6:Interior lightingposted by DAVE LI on
Does the grille lamp fixture T8/T5 surface mounted grille lamp fixture with holes comply with direct-only overhead lighting?
Thanks
How to choose Zone system (ERV+Separate air conditioner)
CI-v4 EQp1:Minimum indoor air quality performanceposted by JAMES CHEN on
We are currently experiencing
(1) One ERV supplies OA to one space (the air conditioner is separated).
Option 2 - Conservation Organization
NC-v4 SSc2:Site development - protect or restore habitatposted by Luis Huertas on
The credit option 2 calls for a land trust or conservation organization. We are evaluating a project outside the US and want to understand what is an acceptable conservation organization?
LEED Online Form / Energy Star Target Finder
CI-v4 EAp2:Minimum energy performanceposted by SSN Energy Model on
Hi,
The below-mentioned contents were copied from LEED Online form. Could you explain, how the energy star values should be compared with Energy Model?
New LEED CS v4 project adjaent to LEED ND project
CS-v4 LTc1:LEED for Neighborhood Development locationposted by Susan Di Giulio on
We are working on a LEED-CS v4 project which is adjacent to (across the street from) a LEED-ND pilot project certified site by the same owner.
Location valuation factor & BDPO calculator
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Julien Richard on
Hello, For products with multiple components compliant with sustainable criteria that arrive at the project site ready for installation (ex : a chair) : 1) To apply the location valuation factor,