Sound transmission - STC vs Rw

NC-v4 EQc9:Acoustic performance
posted by  Indochine Engineering VN  on 

Hi, It is told that Rw is very similar to STC, I would like to ask for Sound transmission, Does LEED recognize the use of Rw (Weighted Sound Reduction index) and ISO 140 (acoustic) standard instead

3
Tue Apr 24, 2018, 1:37 pm

Flush Out for "During Occupancy" Case of a Major Renovation proj

NC-v4 EQc4:Indoor air quality assessment
posted by  Shabari Shaily Gerber  on 

Our project is an office building undergoing major renovation. The building will remain operational while the renovation is ongoing.

4
Tue Apr 24, 2018, 9:14 am

Losses through tank in HW loop

NC-v4 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

ASHRAE 90.1 states:

G3.1.3.6 Piping Losses losses shall not be modeled in either the proposed or baseline
building designs for hot water, chilled water, or steam piping.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Tue Apr 24, 2018, 5:42 am
3
Default Avatar
Green Lab
LEEDuser Basic Member
6 thumbs up
Mon Apr 23, 2018, 3:40 pm

Pneumatic Controls - Monitoring Based Cx

CI-v4 EAc1:Enhanced commissioning
posted by  Christopher Lim  on 

I am currently working on a TI project for two floors of a mid-rise building. The current building uses pneumatic controls for the entire building.

0

one product both meet two criteria in option2.

CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materials
posted by  Renaud Gay  on 

Dear All, for option 2 calculation, I have a question on it. My project is a CI retail project. They will use carpet which include recycled content.

8
Sun Apr 22, 2018, 7:09 pm

Multi-occupant spaces required?

Retail-CI-v4 EQc6:Interior lighting
posted by  Jared Silliker  on 

I find the reference guide confusing on this credit. Am I reading it correctly that multi-occupant spaces do NOT need to be addressed for lighting controls within v4 Retail projects?

0

Confirm: Tenant WE calc can include Base Building rainwater system

CI-v4 WEp1:Indoor water use reduction
posted by  Brian Salazar  on 

Hello!  I have a CI project where the tenant occupies multiple contiguous floors.

3
President, LEED AP, WELL AP
Entegra Development & Investment, LLC
LEEDuser Premium Member
43 thumbs up
Fri Apr 20, 2018, 2:13 am

ASHRAE 50% AEDG

CI-v4 EAc2:Optimize energy performance
posted by  AMY VAN DAM  on 

Can a project pursue the prescriptive compliance path if there is not a ASHRAE 50% Advanced Energy Design Guide that is specifically applicable to the base building (i.e.

8
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Thu Apr 19, 2018, 9:00 pm

Pilot Credit Required or not

CI-v4 INc1:Innovation
posted by  Len Sciarra  on 

With the Innovation in Design credit for LEED-CI v4, the reference guide indicates that you can achieve all 5 credits thru a combination of innovation and exemplary performance credits (option 3).&

4
Default Avatar
Founder and CEO
Greenwave Global Consulting (GGC)
LEEDuser Basic Member
8 thumbs up
Thu Apr 19, 2018, 4:43 pm