Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Brick and rubble in soil

CS-v4 MRc5:Construction and demolition waste management
posted by  Marilyn Specht  on 

We are working on a LEED v4 Core & Shell project in an urban core. We are targeting 2 points for MRc5 and have an aggressive Construction & Demolition Waste Management Plan underway.

2
Senior Principal | Director of Sustainability Integration
SmithGroup
LEEDuser Expert
43 thumbs up
Mon Mar 12, 2018, 5:59 pm

use open space outside of project area

Healthcare-v4 SSc3:Open space
posted by  Lene Hill  on 

We have a project (building and parking lot) being built in a small master planned community.  The community has several open spaces natural areas adjacent to the project with walking trails.&

0

Greenfield

NC-v4 SSc2:Site development - protect or restore habitat
posted by  Lene Hill  on 

The site is about 47 acres of woods and meadow. It was at one time part of an estate and had a home, garden etc on it.  This is where the new site is going.

1
Mon Mar 12, 2018, 6:14 pm

How to Model unit heater in Basel & Proposed model following 90.1-2010?

Mid-Rise-v4 EAp2:Energy metering
posted by  soham babu  on 

In my Proposed model(Design) I have DOAS with gas heating, VRF Fan coil units & Electric Unit heaters. following ASHRAE-90.1-2010,

1
Tue Jan 22, 2019, 8:00 am

Are HPDs required to be 3rd Party Certified?

NC-v4 MRc4:Building product disclosure and optimization - material ingredients
posted by  Dick Moreno  on 

We are looking to pursue an HPD for our product(s) but I am unsure if we need the HPD to be 3rd party certified.  I see a couple of my competitors with self-published HPDs and I cannot see in

2
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Fri Mar 9, 2018, 12:15 am

Two Phase Renovation - Two phases of testing possible?

CI-v4 EQc4:Indoor air quality assessment
posted by  Katherine Roth  on 

The commercial interiors project includes the renovation of an office space in two phases. 1/2 of the tenant space will be renovated in Phase I.

0

Preferred Parking Location

NC-v4 LTc8:Green vehicles
posted by  Michelle Rosenberger  on 

Previous rating systems required preferred spaces to be located closest to the primary entrance exclusive of ADA and though the two examples in the reference manual depict that kind of scenario the

2
Sustainable Design Lead
CannonDesign
LEEDuser Expert
378 thumbs up
Thu Mar 8, 2018, 9:36 pm

Outside airflow rates

CI-v4 EAp2:Minimum energy performance
posted by  Juan Carlos Sanabria Fallas  on 

Hi I receive this comment of the reviewers:

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Thu Mar 8, 2018, 7:26 pm