Forum quick links
Assessment Influence on Design
NC-v4 SSc1: Site assessmentposted by Summer Minchew on
My question ties back to the FAQ response: "The credit requires that projects assess each feature, but it does not require that every assessment influence the project design." This credit was denie
UL Greenguard Gold Standard version
NC-v4 EQc2:Low-emitting materialsposted by Charline SEYTIER on
Hello,
LEED Addition - use Entryway from Adjoining building?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Joyce Kelly on
A two story LEED addition will be regularly accessed from a new stair/elevator tower as well as a corridor at each level that connects it to the existing building.
Waste Valet - Qualified Waste Management Credit?
NC-v4 MRp1:Storage and collection of recyclablesposted by Anna Robinson on
I have a vendor who is telling me that waste valet service (picking up trash door-to-door) qualifies as a LEED credit. Is this the case?
Differences of Glazing Factor and Daylight factor
NC-v4 EQc7:Daylightposted by Matouleibi Chingsubam on
Dear Leed Support,
I was doing daylight calculation using glazing factor formulae. I would like to know how to get Window Geometry Factor and window height factor.
Historical Building
NC-v4 LTc3:High priority siteposted by Luisa Tonelli on
Is there a year before which a building can be consider historic for USGBC?
LEED v4 ID&C EAp2 Baseline Envelope
Retail-CI-v4 EAp2:Minimum energy performanceposted by Christopher Jones on
I am somewhat confused by the Minimum Energy Performance Calculator, Opaque Assemblies sheet: "All baseline existing roofs, above-grace exterior walls, below-grade exterior walls, exposed floors, s
Food grade plastic within grocery installation?
Retail-CI-v4 EQc2:Low-emitting materialsposted by Jared Silliker on
I'm working on a grocery project that includes custom installations (oddly falls under furniture, I guess) that require food-safe surfaces.
Open-Loop Heat Pump System/Process Water Use
NC-v4 WEp2:Indoor water use reductionposted by Kara Rousselle on
Can an open-loop ground source supply/injection well heat pump system be used for the heating and cooling system on a LEED v4 project? Does the WE Prerequisite: Indoor Wat
Automatic lighting control in student rooms
NC-v4 EAp2:Minimum energy performanceposted by Craig Flandermeyer on
How does ASHRAE 90.1-1010 apply to a university residence hall student room? In the past, we have not included automatic control due to potentially different activity patterns of the 2 room o