Exemptions or lower limits : Art Galeries (Museum) ?
NC-v4 EQc7:Daylightposted by Marilou Communeau on
Hello, I have a technical question about the credit Daylight for a Museum (with art galleries, offices, restaurant).
LEED Compliant Faucets
NC-v4 WEp2:Indoor water use reductionposted by Ann E on
Hi,
Any list of suppliers who can provide a LEED Compliant Faucets?
Change to Furniture Evaluation Criteria
NC-v4 EQc2:Low-emitting materialsposted by Ian Thompson on
There was a rating system correction at the end of January http://www.usgbc.org/node/10611490 which seems to reduce the value of a Furniture Evaluation complying to Section 7.6.1 of ANSI/BIFMA e3 –
Minimum Energy Performance and moduline units
CI-v4 EAp2:Minimum energy performanceposted by Scott Harbaugh on
The facility in which we are designing a 20,000+ square foot office space project is served by the old Carrier moduline units. Is it possible to get EQ prerequisite Minimmum Energy Performanc
Architectural Design Guideline for LEED platinum Project under CORE & SHEEL V4
NC-v4 MPR1:Must be in a permanent location on existing landposted by Subrota Roy on
Hi,
We are going to start Architectural drawing design of one project. ( Project targeted rating level PLATINUM Under CORE & SHEEL V4)
Project data as follows :
greenroofs soils
NC-v4 SSc2:Site development - protect or restore habitatposted by Ricardo Sá on
Dear All,
Estimate annual energy use of the office outside U.S.
CI-v4 EAc4:Renewable energy productionposted by Ameet AA on
The project is in Ho Chi Minh city - tropical climate, so there is no demand for heating and the office will use only electricity.
Combining option 1 and 2
CS-v4 SSc2:Site development - protect or restore habitatposted by Emmanuel Pauwels on
Our project is a zero lot line. We would be able to install a green roof for 20% of the project site surface which is not enough since the treshold is 30%.
IN Credit 2: LEED Accredited Professional
CI-v4 INc2:LEED Accredited Professionalposted by Allen Cornett on
To achieve this credit must you have a LEED AP ID+C as a principal participant, or can you have a LEED AP BD+C as a principal participant on a commercial interiors project and still achieve this cr
design case water calculation
NC-v4 WEc2:Indoor water use reductionposted by Azaz Ansari on
why is the no information required to enter in design water calculation to accomodate visitors?
Please note we have visitor column in calculation sheet.