Forum quick links
achievability with green roofs
NC-v4 SSc2:Site development - protect or restore habitatposted by Jens Apel on
This project is previously developed, though existing buildings have been demolished and basically the site is a sand area with some vegetation on it that developed after demolition.
Distance between bicycle storage and bicycle network
NC-v4 LTc6:Bicycle facilitiesposted by Lise Dannesboe on
Hi.
"Design or locate the project such that a functional entry or bicycle storage is within a 200-yard (180-meter) walking distance or bicycling distance from a bicycle network"
EPD
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Ann E on
Hi! Is EPD for finish products/materials only or also for raws? Can you give examples of products/materials with EPD's?
Vertical Gardens
NC-v4 SSc2:Site development - protect or restore habitatposted by Magda Aghababyan on
Hi all,
We have a project which is going to have vertical gardens with native and adapted plants on the building walls. Can we count these areas for the credit compliance?
MBCx and Advanced Energy Metering
NC-v4 EAc1:Enhanced commissioningposted by Matt Grace on
Is it agreed that a project can pursue MBCx without first achieving Advanced Energy Metering?
Cheers,
Matt
Water Meter Accuracy
CS-v4 WEp3:Building-level water meteringposted by Ciaran McCabe on
For Water meters under LEED V4 is there any requirements in terms of their accuracy ?
LEED CS V4 Design of Snow park
CS-v4 EAp2:Minimum energy performanceposted by Shahana Sayed on
What should be the EAp2 baseline consideration for snow park/ski park within a mall in UAE.
Labelling of waste containers
NC-v4 MRp2:Construction and demolition waste management planningposted by Lise Dannesboe on
Hi.
CS-v4: Only 1 water subsystem available to be metered, 2nd subsystem proposed to be metered in future. Is this acceptable?
CS-v4 WEc4:Water meteringposted by Mugdha Mokashi on
We are working on a core and shell project which currently has no indoor plumbing fixtures installed. So we have just one sub-system to meter (irrigation).