Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Habitable buildings

ND-Plan-v4 MPR3:Must comply with project size requirements
posted by  Antonio Macedo Filho  on 

Hi, Eliot! 
The project must have at least two habitable buildings, but it would necessarily residential buildings? Would this "habitatable" word be in the sense of residence itself?

2
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Wed Oct 11, 2017, 2:23 pm

underfloor system supplying minimum outside air with radiant panel

NC-v4 EQc5:Thermal comfort
posted by  X. Chen  on 

Hi, we are designing a project that has a DOAS unit serving code min outside air through underfloor plenum to the space with ceiling radiant panels handling heating and cooling load.

1
Mon Dec 4, 2017, 4:40 pm

Option 3?

EBOM-v4 LTc1:Alternative transportation
posted by  Catalyst Partners  on 

Has anyone had experience with Option 3?  It appears we will not get any points in Option 2 - it's a fairly isolated building where everyone drives on their own.  

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Tue Oct 10, 2017, 8:12 pm

Option 3 - Core Performance Guide???

NC-v4 EAp2:Minimum energy performance
posted by  Erica Downs  on 

The prescriptive path under Option 3 still references the "Advanced Buildings Core Performance Guide".  However, this guide has been "sunset" by NBI and no longer exists.  Typic

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Tue Oct 10, 2017, 7:45 pm

Minimun size

ND-Plan-v4 MPR3:Must comply with project size requirements
posted by  NUBIA VALLES  on 

What is the minimum size for a LEED ND Project? I just found this about the maximum.

3
Tue Oct 10, 2017, 4:08 pm

infirmary

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Francesco Passerini  on 

We are dealing with an educational building and we are considering ASHRAE 62.1-2010. Inside there is an infirmary.

Which occupancy category shall I consider for that space?

1
Mon Oct 9, 2017, 2:54 pm
4
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Mon Oct 9, 2017, 10:19 am

Modelling Fan Coil Units in Tenant Areas with no Lease Agreements

CS-v4 EAp2:Minimum energy performance
posted by  Michael Hammond  on 

I’m working on a LEED v4 C&S office building and there are no tenant lease agreements associated with the tenant area mechanical systems (Client does not want to impose any restrictions on obta

1
Wed Oct 25, 2017, 8:14 pm

LEED v4 projects that demonstrate compliance using ASHRAE 90.1-2013

NC-v4 EAc2:Optimize energy performance
posted by  Vina Vales  on 

Is there a different Table 1: ASHRAE 90.1-2013 Appendix G percentage Improvement that we can use for those projects under LEED v4 but using ASHRAE 90.1-2013?

If so, please forward.

1
Fri Oct 6, 2017, 2:52 pm