Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

Minimun size

ND-Plan-v4 MPR3:Must comply with project size requirements
posted by  NUBIA VALLES  on 

What is the minimum size for a LEED ND Project? I just found this about the maximum.

3
Tue Oct 10, 2017, 4:08 pm

infirmary

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Francesco Passerini  on 

We are dealing with an educational building and we are considering ASHRAE 62.1-2010. Inside there is an infirmary.

Which occupancy category shall I consider for that space?

1
Mon Oct 9, 2017, 2:54 pm
4
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Mon Oct 9, 2017, 10:19 am

Modelling Fan Coil Units in Tenant Areas with no Lease Agreements

CS-v4 EAp2:Minimum energy performance
posted by  Michael Hammond  on 

I’m working on a LEED v4 C&S office building and there are no tenant lease agreements associated with the tenant area mechanical systems (Client does not want to impose any restrictions on obta

1
Wed Oct 25, 2017, 8:14 pm

LEED v4 projects that demonstrate compliance using ASHRAE 90.1-2013

NC-v4 EAc2:Optimize energy performance
posted by  Vina Vales  on 

Is there a different Table 1: ASHRAE 90.1-2013 Appendix G percentage Improvement that we can use for those projects under LEED v4 but using ASHRAE 90.1-2013?

If so, please forward.

1
Fri Oct 6, 2017, 2:52 pm

Staff resources for LEED ND Projects

ND-Plan-v4 MPR2:Must use reasonable LEED boundaries
posted by  Devani PERERA  on 

Hi,

Is it necessary to have a Leed Green Associate or a Leed AP ND to propose one project to the certification LEED ND (plan or built) ?

Thanks for your help.

Regards.

3
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Fri Oct 6, 2017, 9:06 am

Breakdown in question...

NC-v4 EAc3:Advanced energy metering
posted by  emily reese moody  on 

I'm funneling this question on behalf my mechanical engineer:

Our total breakdown of energy use is as follows:

1
Fri Oct 6, 2017, 2:46 pm
4
Director, Sustainability
Ledcor Construction Limited
LEEDuser Premium Member
2 thumbs up
Thu Oct 5, 2017, 5:08 pm

5 materials versus 5 material waste streams

NC-v4 MRp1:Storage and collection of recyclables
posted by  Susan Walter  on 

Page 479 in the RG states that you need to identify 'at least five materials...targeted for diversion.' On page 481 in Step 3, the 5th step says that you need to 'specify the means and methods of d

1
Fri Nov 3, 2017, 7:40 pm