Forum quick links
Does a covered non-enclosed ground level vehicle circulation to the lobby contribute to the total site paving area?
NC-v4 SSc5:Heat island reductionposted by Nicholas Chan on
Hi!
Construction IAQ Management Plan during demolition phase?
NC-v4 EQc3:Construction indoor air quality management planposted by Elizabeth Kertesz on
For a major renovation project, should we implement the Construction IAQ Management Plan in our unoccupied building during the demolition phase? The reference guide says to implement the plan
how can attachments (drawings, images) be sent in a CIR?
NC-v4 IPc1:Integrative processposted by Sara BENLOUBA on
Dear Everybody,
TOD No Minimum for Parking
NC-v4 LTc7:Reduced parking footprintposted by Graham Linn on
Hello - I have project placed within a Transit Oriented Development (TOD) Overlay. For this city the zoning code in this overlay now says there is "no minimum" for off street parking.
Creating Baseline building Shell based on ΑSHRAE 90.1-2010 - proposed building walls with more than 40% of glass
NC-v4 EAc2:Optimize energy performanceposted by Konstantina Kalliakoudi on
Hello to all LEED Users,
My proposed building has following percentage of glass at each orientation:
NE: 90% percentage of glass
SE: 90% percentage of glass
Insulation in Interior walls for Vault Spaces in Data Center
NC-v4 EAc2:Optimize energy performanceposted by Rajat Wadhwa on
Hi Everyone,
Regional Priority credit for an L&T credit
CI-v4 LTc1:LEED for neighborhood development locationposted by Cindy Quinn on
Our project is located in an ND Gold certified neighborhood. If we pursue the LEED for ND location credit in leiu of other L&T credits, how can we receive a Regional Priority point for Ac
Zone Secondary Recirculation Fraction
NC-v4 EQp1:Minimum indoor air quality performanceposted by Dave Hubka on
ASHRAE 62.1, Section A1.2.2 states:
Er is less than 1.0 for plenum return systems with secondary recirculation (e.g. fan-powered VAV with plenum return)