Forum quick links
Gas vented fireplace
NC-2009 EAp2:Minimum energy performanceposted by Carlos Vazquez on
I have a project were there is a 24,000 Btuh gas vented fireplace. Is a wall device mostly radiant heater (70-75%) with a glass panel which does not have a fan.
Maintenance Garage Baseline System
NC-2009 EAp2:Minimum energy performanceposted by Keith Lane on
I'm hoping someone can help me determine the appropriate Baseline system for a Vehicle Maintenance Facility for a LEED v2009 project. The total project area is about 34,500 s.f.
Baseline LPD for a Vehicle Driving Test ground
NC-2009 EAp2:Minimum energy performanceposted by Aru Sau on
There is Car Driving Test Ground located outside the building, which takes power from the substation inside the building. This ground is closely resemblance of a space like car racing (i.e.
Process Loads
NC-2009 EAp2:Minimum energy performanceposted by Paula Hernandez on
Hello, I am modeling a bulding where wine is made (don´t know how to say it in English, sorry), the thing is that there are many spaces in the project that have AHU just to process or store the wi
Museum additional interior lighting
NC-2009 EAp2:Minimum energy performanceposted by Luis Andrade on
Hello,
U value requirement for " Roof Hatch"
NC-2009 EAp2:Minimum energy performanceposted by Faisal on
Hi...
Does the proposed or basleine U or SHGC value requirement for the ROOF construction would also be applicable of " Roof Hatch"?
Fan power in conditioned space
NC-2009 EAp2:Minimum energy performanceposted by Panupant Phapant on
Hello, My production line space in our project have an supply fan, exhaust fan and make-up fan to supply OA in conditioned space.
Determining R-values for LEED wall assembly
NC-2009 EAp2:Minimum energy performanceposted by Todd Bundren on
Is there a standard way the USGBC wants the R-value of a wall assembly to be calculated taking into account the framing factor or thermal bridging that occurs with metal studs?