NC-2009 EAc1:Optimize energy performanceposted by Rahula Attalage on
Dear All,
Minimum 18% energy saving after April 2016 - Scoring
NC-2009 EAc1:Optimize energy performanceposted by Eric Claycamp on
My project will likely reach 20% to 23% Energy Savings. Does this mean I can only score the points after I meet the minimum? In other words is a 20 percent reduction only one credit point?
Energy modeling- DOAS units with reactivation air
NC-2009 EAc1:Optimize energy performanceposted by Matt Hollenbeck on
I have an HVAC system that will use a DOAS unit to supply neutral temperature air in a humid climate (climate zone 2). The proposed DOAS unit utilizes a dessicant wheel with reactivation
Office Building with Data Center
NC-2009 EAc1:Optimize energy performanceposted by Lise Dannesboe on
I have a possible case with a office building that also contains a large Data Center.
Energy Saving from Process Boiler
NC-2009 EAc1:Optimize energy performanceposted by sompoche sirichote on
Our project is an existing manufacturing project and we have 1 existing steam boiler and will install 1 new.
What to do when electricity produces less carbon than gas?
NC-2009 EAc1:Optimize energy performanceposted by Raphael Sperry on
Hello all, I'm working on a project for an owner who operates their own hydropower dam. It's an older facility and it the electricity it produces registers as basically carbon neutral.
Constructions surrounding new data center in existing building
NC-2009 EAc1:Optimize energy performanceposted by Ross Farris on
I am working on a project that consists of an existing building which will be retrofitted and modeled as a major renovation under LEED BD+C.
Mixed building
NC-2009 EAc1:Optimize energy performanceposted by Khaled Fouda on
Utility rates is a confusing thing for me, I am working on a building that has 9% Retail Area, 7% Church and the rest is a Residential Area.
Modeling Laboratory Systems
NC-2009 EAc1:Optimize energy performanceposted by Victoria Watson on
Hi, I am starting work on a laboratory building and have been looking at the standards to see how they apply.