View Type 1 with non-continuous window glazing
NC-v4 EQc8:Quality viewsposted by Edgar Arevalo on
I have a library that has a reading area with windows surrounding all sides but are separate by the interior wall, which makes the glazing non-continuous. The wall space between windows are a
"Weighted sum of non-roof and roof measures" Issue
NC-v4 SSc5:Heat island reductionposted by Edgar Arevalo on
Under the Summary of Heat Island Reduction Measures, the footnote says "Weighted sum of nonroof and roof measures must be greater than or equal to sum of project paving and roof area for 2 points."
MERV Filters for PM 2.5
NC-v4 EQp1:Minimum indoor air quality performanceposted by Banu Banu on
Dear All,
In our project we have Direct Evaporative coolers . It is a garment production building. In Evaporative coolers, usually the process is mixing of Air & water.
LEED Daylight Simulation Option1 with IES-VE
NC-v4 EQc7:Daylightposted by Mahshid Sedighimoghaddam on
Hello everyone,
We are doing Daylight simulation with IES-VE software in compliance with LEED daylighting Option 1.
Desiccant Wheel Modeling for Baseline case
NC-v4.1 EAp2:Minimum Energy Performanceposted by John on
I am working on a model which has Desiccant wheel in design case. Do we need to model desiccant wheel in baseline case as well?
Thermal Comfort Control
NC-v4 EQc5:Thermal comfortposted by Martin Maribo on
How can individual thermal comfort controls be achieved for individual workstations in an open office?
CDWM - Recycling Facility Diversion Rate
NC-v4 MRp2:Construction and demolition waste management planningposted by Preethi Sreeraj on
It is clear from the guidance that a project will need the diversion rate of the Comingled facility that is regulated by local or state agency, but is this applicable for source separated wast
Location of outside airflow measuring station inside the HVAC unit
NC-v4 EQp1:Minimum indoor air quality performanceposted by Edgar Arevalo on
We have a 100% outside air HVAC with an energy recovery wheel serving the entire the project space. Since there is no recirculating air getting reintroduced to the supply side, the MEP engine
Problems with v4v4 1_Indoor Water Use Reduction Calculator_v05.1.xlsm
Schools-NC-v4 WEp2:Indoor water use reductionposted by Alexia Anastassiadis on
Hi all!
Biophilic Design as a Guiding Principle in Sustainable Design
Pilot-Credits EQpc123:Designing with Nature, Biophilic Design for the Indoor Environmentposted by Carla Roubaud on
Securing this credit goes beyond ticking boxes; it requires thoroughly blending natural elements into the architecture.