Forum quick links
Calculating total cost of materials
CI-v4.1 MRc4:Sourcing of Raw Materialsposted by Cindy Quinn on
To calculate the total cost of materials, can an ID+C project use the default of 45% of total cost of construction? The v4.1 calculator has a separate 'Instructions' tab for BD+C projects (wh
LEED ND Innovation/Pilot Credit Library
ND-v4 INc1:Innovationposted by Matthew VanSweden on
It seems there are VERY few Innovation and/or Pilot LEED v4 ND options available.
"with a specialty appropriate for the project."
ND-v4 INc2:LEED Accredited Professionalposted by Matthew VanSweden on
Considering how few LEED AP ND professionals there are, and how few LEED-ND certified projects, would a LEED AP BD+C qualify for a specialty "appropriate for the [ND] project?" Asking for a friend.
New certified building on an existing campus
NC-v4.1 LTc7:Reduced Parking Footprintposted by Emma Onofri on
Hello everybody,
LEED Online Open Space Form
NC-v4 SSc3:Open spaceposted by Azra on
Dear all,
I noticed something peculiar in my last project.
Green Building Education - Educational Outreach Program vs. Guided Tour
NC-v4 INc1:Innovationposted by Katy Keene on
For our project, we are planning on selecting the below two options:
Ride Share vs Car Share // Alternative Compliance and/or Equivalency
ND-v4 NPDc8:Transportation demand managementposted by Matthew VanSweden on
In 2023, the availability of ride-share platforms (i.e., Uber and Lyft) has made some early market car-sharing platforms obsolete (i.e., ZipCar and others).
Does a covered non-enclosed ground level vehicle circulation to the lobby contribute to the total site paving area?
NC-v4 SSc5:Heat island reductionposted by Nicholas Chan on
Hi!
Exterior doors/windows in v4.1
NC-v4.1 EQc2:Low-Emitting Materialsposted by Emily Purcell on
Hi all,