Forum quick links
Do you need to have landscaping in current design to use landscaping water submeter for this credit? & a question about hot H2O.
NC-v4 WEc4:Water meteringposted by Beth Brownlie on
Our project is a model and protype shop at a private art and design institution.
Concrete Form Release Oil VOC limit
NC-v4 EQc2:Low-emitting materialsposted by Ian McCall on
Dear All, Are concrete form release oil VOC limits included in the credit "Low-emitting Materials"?
shower quantity discrepancy for large-occupancy projects
NC-v4.1 LTc6:Bicycle Facilitiesposted by Megan Bodin on
There is a discrepancy between the requirements for shower quantities for large-occupancy projects.
Extra point for multiple routes / 60%?
NC-v4.1 LTc5:Access to Quality Transitposted by Joseph Snider on
Under v4, there is an option for getting an extra point if you have a number of different routes and nothing is more than 60% of the trips. Does anyone know if that option is stil available u
Interior Reuse - is pipework and air duct Interior non structural elements?
CI-v4 MRc2:Interiors life-cycle impact reductionposted by shashank gangil on
We are doing a LEED CI V4 project. The client will use existing air duct, diffuser, grilles, provided by the landlord and AC chilled water pipe.
Regional ACP for LEM VOC Emissions Evaluation - Manufacturer statement
NC-v4.1 EQc2:Low-Emitting Materialsposted by Muhammad Mahasneh on
Greetings,
i would like to ask about the April 2023 Update to the Regional ACP ID# 100002473 regarding Low Emitting materials:
Option 2: Priority Designation - local equivalent program
NC-v4 LTc3:High priority siteposted by N. Josef Nassif on
Dear Community
I hope you are doing fine.
I have a question regarding the Option 2 in high-Priority site. In LEED V4 it says:
Can shades from renewable energy systems with the energy sold off-site be considered as a nonroof measure?
EBOM-v4.1 SSc2:Heat Island Reductionposted by Dharmaraj Sivasubramanian on
Hi! all,
Can shades from renewable energy systems (owned or rented) with the energy sold off-site be considered as the nonroof measure for heat island reduction?
ASHRAE 90.1-2010 Table 6.8.1c
NC-v4 EAp2:Minimum energy performanceposted by study topenergy on
Hello,
Shower Requirement
CI-v4.1 LTc4:Bicycle Facilitiesposted by Sabrina Flagstad on
Is it okay to have the showers located within the same building as the CI, but not within the LEED Project Boundary?