Forum quick links
Green roof
NC-v4 SSc4:Rainwater managementposted by Dina El-Sady on
Is my understanding correct that the building roof must be green to satisfy this credit ?
Project boundary for rainwater management
NC-v4 SSc4:Rainwater managementposted by Nithya Madan on
Hello,
Site Visits for Commissioning Agent?
NC-v4 EAp1:Fundamental commissioning and verificationposted by Kasandra Martin on
What is the average number of site visits for the Commissioning Agent? It appears a summer and winter for HVAC. One prior to occupancy and then one several months after everything has b
LEED boundaries for 2 different projects
NC-v4 SSc4:Rainwater managementposted by Mohammed Fadili on
Hello all,
Benchmark data
EBOM-v4.1 WEc1:Water Performanceposted by Jeanne Perrine on
Hello, I am looking for water consumption data from LEED-certififed buildings. I would also require same for the Energy Performance and Waste Performance credits.
Marking up EPDs
NC-v4.1 MRc2:Environmental Product Declarationsposted by Martha Norbeck on
I've been dinged for not marking up EPDs, but most EPDs are secure documents that can't be annotated.
where and how to install advanced meters?
NC-v4 EAc3:Advanced energy meteringposted by Sara BENLOUBA on
Dear all,
Landscaped Terraced areas
NC-v4 SSc2:Site development - protect or restore habitatposted by Nermin Hegazy on
Hello,
Potential non-compliance with regulation
NC-v4 EAp1:Fundamental commissioning and verificationposted by Timothy Ian Middleton on
Our CxA is stuck on points of compliance with local regulations.
For v4.1 Option 2 Air Testing Path 1 (Particulate Matter and Organic Gases) direct calibrated instrument sampling duration
NC-v4 EQc4:Indoor air quality assessmentposted by james jozwiakowski on
New to v4.1
1.What is the expected duration for each sample location when using direct read? I cannot find any reference in either the ISO methods listed or in LEED