Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

What is the difference between V01 form of V4 version and V4.1 version

Data-Centers-NC-v4 MRp1:Storage and collection of recyclables
posted by  David LEBRET  on 

Hi, I'd like to know the difference between V01 form to be completed of version V4 and V4.1.

Thanks

1
Thu Jan 20, 2022, 4:16 am

Documenting local equivelant

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Omar Elrawy  on 

We have a project in Vietnam in which the local standard (5.5 lps/person) is more stringent than ASHRAE 62.1.

Q1: Does a more stringent standard means higher fresh air requirements?

5
Associate, Sustainability
Thornton Tomasetti
LEEDuser Basic Member
12 thumbs up
Thu Dec 16, 2021, 8:46 pm
6
Senior Energy Wizard
TLC Engineering Solutions
LEEDuser Basic Member
44 thumbs up
Thu Dec 16, 2021, 5:04 pm

ENERGY MODEL FOR OFFICE IN BASEMENT

CI-v4 EAp2:Minimum energy performance
posted by  S S  on 

Hello to All,

Greetings!

I am doing the energy model for Office Building which has located in Basement. In our software, U value only can be given as input.

3
Default Avatar
LEEDuser Basic Member
0 thumbs up
Wed Dec 15, 2021, 7:07 pm

Where and how install the meters in a in a new multi-use construction?

NC-v4 EAp3:Building-level energy metering
posted by  Sara BENLOUBA  on 

Dear all,

We have a tower with multi-storey building, made up of 3 components: Offices, hotel and residential. We follow as a reference the " BD+C NC "

1
Thu Dec 16, 2021, 2:17 pm

Shower Facilities - 200 yard requirement

NC-v4.1 LTc6:Bicycle Facilities
posted by  Theresa Lehman  on 

In LEED v4, the 200 yard requirement was removed for shower facilities.

1
Wed Dec 15, 2021, 3:19 pm

Light meter to obtain light reflectance of finishes?

NC-v4 EQc6:Interior lighting
posted by  Erin Holdenried  on 

We are having trouble getting light reflectance values from the manufacturer for a number of finishes.  Has anybody tried using some sort of light meter to get the value yourself?

1
Wed Dec 22, 2021, 6:47 am

Fruitful trees

Pilot-Credits SSpc82:Local food production
posted by  Adriana Hansen  on 

Considering fruitful trees, to attend the credit area requirements can we count the area of the tree canopy, the actual growing area, considering adult size of the trees (> 3 years)?

3
Mon Dec 13, 2021, 3:13 pm

Are toilets considered occupiable?

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Timothy Ian Middleton  on 

We have a factory project with some rooms where I am not sure about their classification as "occupiable" or not. Specifically they are "dirt removal" and "cleaning" rooms.

5
Mon Dec 13, 2021, 9:26 am

Manual Demand Response

NC-v4.1 EAp2:Minimum Energy Performance
posted by  Ayman Raouf  on 

I dont quite understand the Demand response credit.

1
Sun Dec 12, 2021, 6:51 pm