Spaces used for business purposes

CS-v4 EQp2:Environmental tobacco smoke control
posted by  Andreas Colli  on 

Our project is an existing building, that is to be renovated in large parts and converted fron retail to office ues.

1
Tue Sep 14, 2021, 3:21 am

Fly Ash in Concrete

NC-v4.1 MRc3:Sourcing of Raw Materials
posted by  Catherine Blakemore  on 

Does LEED v4.1 allow the use of fly ash in concrete mixes?

3
Associate Principal - Director of Sustainabilty
Lawrence Group
LEEDuser Premium Member
10 thumbs up
Thu Sep 9, 2021, 11:35 am

Recycable waste

EBOM-v4 MRc4:Solid waste management - ongoing
posted by  Alice Andersen  on 

I would like to know if small combustible material can be counted as "Recycable" if the waste is transportet to a Power plant that burn the waste and turn it into power?

1
Thu Sep 9, 2021, 4:16 pm

Existing steel structure

NC-v4 MRc5:Construction and demolition waste management
posted by  Linda Davisson  on 

Can a building reusing existing steel structure claim the material (or any other existing materials to remain) as contributing to the calculations for waste being diverted away from landfill?

1
Tue Sep 14, 2021, 3:22 am

Non-native/adapted species vs. Adapted species

NC-2009 SSc5.1:Site development - protect or restore habitat
posted by  Jeff Wiedmeyer  on 

Our USGBC reviewer commented on the three requirements of a "lawn" per previous LEED Interpretations, one of which read, "lawn is only acceptable if it does not include any non-native/adap

1
Thu Sep 9, 2021, 12:05 pm

Guestroom Closets and Bathrooms - Non-Regularly Occupied?

NC-2009 IEQc8.2:Daylight and views - views
posted by  Kevin Mowatt  on 

USGBC's IEQ v2009 Space Matrix indicates that Guestrooms (in their entirety) should be considered Regularly Occupied.

0

Energy Star Protfolio Manager

EBOM-v4 EAp2:Minimum energy performance
posted by  Sarfaraj Khan  on 

Hi Can international project (UAE) attempting LEED V4 O&M can used Energy Star Protfolio Manager Regards

3
Tue Sep 7, 2021, 10:08 pm

Choose baseline system for CAV factory

NC-v4 EAp2:Minimum energy performance
posted by  Hyerim Kim  on 

 

I am doing factory served by CAV AHU, cooling only. Constant volume is due to positive pressurization to avoid infiltration.

1
Tue Sep 7, 2021, 3:30 pm

Green Power Query

NC-v4 EAc7:Green power and carbon offsets
posted by  Andrei Sabater  on 

I am Andrei Sabater, employee of ecoSolutions, Right now we are currently studying the credit for the green power and carbon offsets. Is the credit applicable here in the Philippines?

8
Sustainability Consultant
AECOM
LEEDuser Basic Member
2 thumbs up
Mon Sep 6, 2021, 8:04 pm

How to face nova mutation virus by using Re-Enter Your Workspace method?

Pilot-Credits INpc136:Safety First: Re-Enter Your Workspace
posted by  yingling guan  on 

ReOccupancy_Assessment_Tool is a good guide for the proverty management of public areas, but it is difficult to implement the internal management of small tenants.  Is there a convenient tool

0