Forum quick links
Existing base building fixtures
CI-v4 EQc6:Interior lightingposted by Omar Elrawy on
We have an interior fit-out project, in which we are trying to comply with Option 2 (A, B, C, and D)
Pre-selected sites, can a project still opt for Integrative Process credit?
NC-v4 IPc1:Integrative processposted by Nermin Hegazy on
We are studying the feasibility of acheiving LEED certification for a series of floors in an office building.
PV Farm adjacent to Datacenter
Data-Centers-NC-v4.1 EAc2:Optimize Energy Performanceposted by Amal Venugopal on
Greetings!
The proposed Datacenter building is intended to achieve LEED certification under LEED v4.1 BD+C Rating system – Datacenter.
Shared Heat Pump System for Group Project - Is This DES?
NC-v4 EAp2:Minimum energy performanceposted by Aaron Yorke on
Hello everyone,
Referencing the webinar Materials and Resources dated Jan 28, 2019 - Natural Stone credit taken out
NC-v4.1 MRc4:Material Ingredientsposted by Katherine Teel on
Pilot credit library discussion around EPD and Sourcing Credits - subject matter answering questions at the end - a statement was made that the Natural Stone credit had been taken out. can so
LEED Online is not displaying Reginal Priority credit category
NC-v4 RPc1:Regional priorityposted by Norbert Harmathy on
Hello,
We registered a new project under LEED v4 NC. In ALL Credit categories listed, there is NO Regional Priority credit category.
Parking is not close enough!
CI-v4.1 LTc4:Bicycle Facilitiesposted by Jonathan Weiss on
Working on projects in dense urban areas, there is rarely parking within the 200 foot or 300 foot walking distance of the building entry.
Can we certify only the administrative building in a pharmaceutical factory project?
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Amgad Khattab on
We have a pharmaceutical factory project consists of the following buildings: -
1. An administrative building (Ground + 3).
2. A Production building (Ground +2).
Group Project Scoring
EBOM-v4 EAc7:Renewable energy and carbon offsetsposted by Andy Rhoades on
How do I score EAc7 when certifying for a group project? I have the VER proposals for the three buildings but don't know how to score them together. Thanks!
Remediation of LEED Project Area or only disturbed areas
NC-v4 LTc3:High priority siteposted by Mark Meaders on
We have a project that has had a Phase 1 and II ESA performed. It found there was acetone and mercury on site.