Option 2 Strategy E for an Atrium area - No ceiling areas (Open to roof deck above)
NC-v4 EQc6:Interior lightingposted by John Covello on
Hello.
For Option 2, Strategy E.
Can we consider the cafe yard as an open space?
NC-v4 SSc3:Open spaceposted by Dzu Pham on
Hello,
I have a question.
Our project have a cafe space outdoor. Can we consider it as an open space? Can you give me some suggestion?
Option 2: New Building Institute Multifamily Guide under the LEEDv4.1 Residential Multifamily
NC-v4.1 EAc2:Optimize Energy Performanceposted by Anna Korinkova on
Hi,
Multispeed fan to operate at lowest setting when the space in unoccupied?
Retail-CI-v4 EAc2:Optimize energy performanceposted by shashank gangil on
We recently recied following review comment for one of the retail project based in taiwan. The project is using VRF System for cooling. The VRF comes with multispeed fan.
Can a building going for re-certification attempt additional credits that are not performance based
EBOM-v4.1 SSc3:Light Pollution Reductionposted by Frank Weiss on
I understand that a building attempting re-certification is awarded 10 points for their past certification. My question is can a building attempting re-certification using Version 4.1 also at
About LEED-ND Thesis
ND-v2009 NPDc2:Compact developmentposted by Mustafa Kucuk on
Hello to everyone. I am writing a thesis on LEED-ND and I need to give more information about LEED-ND. (How to get a certificate? What are the criteria and sub-titles?
On site visits required?
NC-v4 EAp1:Fundamental commissioning and verificationposted by Kasandra Martin on
The project I am hired to commission is a day drive. Is it possible to only review the contractors tests or is on site necessary or required?
TABLE 6.8.2B Minimum Duct Insulation
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
I want to verify TABLE 6.8.2B Minimum Duct Insulation considering the thermal resistance of a cylindrical wall, which is determined according to the logarithmic equation you can see
Industry wide EPD vs. Product Specific EPD
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Caitlin Hutton on
Hello, I am attempting to achieve option one of the MRc2 credit meaning we need a total of 20 products from 5 different manufacturers.
Reverberation times in warehouse spaces
NC-v4.1 EQc9:Acoustic Performanceposted by Jamie Dubbe on
Are reverberation times applicable to reg occupied warehouse spaces if the room type (warehouse) is not included in Table 2. Reverberation time requirements?