Forum quick links
Green Power Five Year Contracts
NC-v4 EAc7:Green power and carbon offsetsposted by Sean Hogan on
I work for a corporate client seeking the green power credit but has noted they are never likely to enter into minimum five year contracts to procure green power as the constantly check market pric
EAc5 Points
NC-2009 EAc5:Measurement and verificationposted by Jeannie Rueter on
Just trying to understand how the points are awarded for this credit. Option 3 is worth 1 point. Either option 1 or 2 are worth 3 points?
Determination of the solar reflectance
NC-v4 SSc5:Heat island reductionposted by Ricardo Sá on
Dear All,
Shops on the ground floor
Pilot-Credits SSpc55:Bird collision deterrenceposted by Adriana Hansen on
We would like to know if shops in the ground floor of a building, below and shaded by the building footprint, can be exempt from the building façade requirements.
LEED v4.1 draft changes to the EPD credits - review of what's changed, what it means, and what still needs to change
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Panu Pasanen on
The LEED v4.1 draft introduced number of changes to the EPD credits.
Is PV Watts acceptable documentation?
NC-v4 EAc5:Renewable energy productionposted by Erin Holdenried on
Is PV Watts calculator acceptable documentation for this credit? The specific PV panels for our project will not be selected until construction, so we won't have a more specific calculation o
Exterior lighting - Residential roof terrace
NC-v4 EAp2:Minimum energy performanceposted by Camilo Velez on
Hello all,
Does compost also count as a waste stream for MRp1?
Pilot-Credits SSpc129:Comprehensive Compostingposted by Robin Dukelow on
Does the compost count as 1-waste stream for MRp1 or does the retail project have to store and collect 4-waste streams + composting if pursuing Comprehensive Composting?
Exterior lighting - Residential roof
NC-v4 EAp2:Minimum energy performanceposted by Camilo Velez on
Hello all,
we're working on a mixed-use building under LEED NC v4, which has in its last floor a residential space with exclusive access to an open roof terrace.
Building Footprint in mixed used building
NC-2009 PIf2:Project Summary Detailsposted by Victoria Rios Esteve on
Hi everyone,