Does Declare count as Third-Party Verified in LEED v4.1?
NC-v4.1 MRc4:Material Ingredientsposted by Adam Stoker on
The following credit language introduced in LEED v4.1 leaves me with some questions regarding Declare labels:
Adding points from different Tiers?
NC-v4.1 EAc5:Renewable Energyposted by Kimberly Reddin on
Hopefully this is an easy one, I just want to be sure I'm reading this credit correctly. The credit language says “points achieved in each category may be added for a total of 5 point
Compromise between Dust Control by Watering & Water Consumption
NC-2009 SSp1:Construction activity pollution preventionposted by Abdulrahman Sherazy on
The best way I experienced in dust control measures in construction roads is to cover these roads by crushed stone, compact it by the compactor, and finally water it frequently.
LZ3- Glare exemption
NC-v4 SSc6:Light pollution reductionposted by Madhura Dhayagude on
Hello,
I have a question regarding glare ratings for open air showrooms.
Non Regularly Occupied Spaces
CS-v4.1 EQc4:Daylightposted by Mitra Sajjadi on
I have a quick question. Are phone rooms/focus rooms non regularly occupied spaces? I could not find that in the chart and I wanted to make sure my assumption is correct.
LEED Interpretation 10471
CI-v4 IPc1:Integrative processposted by Dave Hubka on
I just learned from a LEED review report that owner's renovating their own space must "identify one or more viable locations, undertake the comparison outlined in Site Selection requirements, and c
VRV/VRF PIPING INSULATION
NC-v4 MPR3:Must comply with project size requirementsposted by Fotis Kotsopoulos on
Dear all,
I need to make particular reference to a BD+C project's technical description with respect to VRV/VRF piping insulation. However:
From uploads with new credits for walkability
CI-v4.1 LTc2:Surrounding Density and Diverse Usesposted by Wayne DeFeo on
The existing form requires that we pick option 1 or option 2...but the new form has option 3.
for option 3 - take light meter measurements with lights on / off?
NC-v4 EQc7:Daylightposted by Beth Brant on
Does anyone know if we are required to take light meter measurements with the interior lights on or off?
VOC Emission Limit California Department of Public Health (CDPH) Standard Method v1.1–2010
NC-v4 EQc2:Low-emitting materialsposted by V Leung on
According to the Manual, the statement is as below.