Forum quick links
UK Equivalent Standards for Optimized Energy Performance
Data-Centers-NC-v4.1 EAc2:Optimize Energy Performanceposted by Sarah Howe on
Hi all, I’m working on a LEED project in the UK and would appreciate clarification on the accepted UK equivalents for Optimized Energy Performance modelling requirements.
Specifically:
MRpc87 Verified Waste Pilot
Pilot-Credits MRpc87:Verified Construction & Demolition Recycling Ratesposted by Michelle Rosenberger on
I am not sure that diversion rates are any better using the RCI facilities.
Kitchen faucet nominal flow rate vs maximum flow rate
CI-v4 WEp1:Indoor water use reductionposted by shashank gangil on
We are doing a CI project in Hong Kong and going to select a kitchen faucet for installation in the pantry.
Counting Dimmable Luminaires
CS-v4 SSc6:Light pollution reductionposted by Helen Biersack on
for a project in lighting zone 3 (U3 allowance or 500 UL and 500 HL for total of 1000), I am reviewing a submittal for a light with the following performance data:
One LCA Action Plan covers multiple products. Can this be accepted?
NC-v4.1 MRc2:Environmental Product Declarationsposted by Raisa Alifa on
Hi All,
Design for Indoor Air Quality and Infection Control Documentation
Pilot-Credits INpc155:Design for Indoor Air Quality and Infection Controlposted by Katherine Tich on
Anyone with experience documenting this credit - did you submit with the design credits or with the construction credits?
Is this SSpc158 Pilot credit available for international projects?
Pilot-Credits SSpc158:Onsite Carbon Sequestration Through Plantingsposted by Andres Schwarz on
I have noticed that the calculator starts asking for the project location, but it only addresses US states (https://planting.itreetools.org/app/location/).
All-Gender Restrooms
Pilot-Credits WEpc147:All-Gender Restroomsposted by Maggie Ma on
The University of Toronto has implemented the All‑Gender Restrooms pilot credit as part of our broader commitment to equity, diversity, and inclusion.
50% of Receptable Controls to meet the Prerequisite
NC-v4 EAp2:Minimum energy performanceposted by Kritika Kharbanda on
We are working on a project where it was missed during equipment procurement that open office furniture is required to have 50% of the receptacles controlled to meet the prerequisite under 90.1-201
Comprehensive Composting
NC-v4 INc1:Innovationposted by Alma Evans on
Hi there, I registered the project I worked on in Austin, TX - Govalle Elementary School for the comprehensive composting pilot innovation point and I want to thank AISD for providing the requ