Forum quick links
New LEED project inside an already certified LEED Project
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Husam Haron on
An office building was constructed and awarded LEED Silver. Now, a new building is being planned to be constructed inside the LEED project boundary of the the already certified LEED project.
Is a new v4 project allowed within an existing earlier LEED version project boundary?
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Neumann Monson on
Our client has taken ownership of a property that was LEED certified many years ago under an older version of LEED, maybe NCv2.1. They would like to build a new LEED certified structure on so
On-site EV required if only off-site parking provided?
NC-v4.1 LTc8:Electric Vehiclesposted by Rebecca Aarons-Sydnor on
The first line of the credit states the criteria as "Provide charging infrastructure for electric vehicles for on-site parking." However, under Option 1, it refers to "all parking spaces used by pr
Dividing large building into smaller ones
Healthcare-v2009 EAp2:Minimum energy performanceposted by Davide Liviero on
Hello everyone,
Specification Section for LEEDv4 Construction Waste Requirements
NC-v4 MRc5:Construction and demolition waste managementposted by Summer Gorder on
Does anyone have a template or resource for integrating LEEDv4 Construction Waste Management requirements into specifications?
Green power and carbon offsets - 100% Electric Building
CS-v4 EAc7:Green power and carbon offsetsposted by Wayne Mc Fall on
Hi All,
Campus Approach
NC-v4 MRp1:Storage and collection of recyclablesposted by Ricardo Sá on
Dear All,
we are applying the Campus Approach to certify a set of buildings within the same site (using the LEED NC BD+C v4).
Bike storage in a garage
NC-v4.1 LTc6:Bicycle Facilitiesposted by Mark Meaders on
I have a clarifying question in regards to bike storage in relation to the storage being in a garage.
Pilot Credit for EPDs vs. V2009 MR4 and MR5?
NC-2009 IDc1:Innovation in designposted by Lawrence Lile on
Is it allowed to persue V4 Building product disclosure and optimization - environmental product declarations as a pilot credit, under Innovation in Design, while also persuing V2009 MR4 and M
Integrated chiller controls and VFD pumps
NC-v4 EAc3:Advanced energy meteringposted by Crina Bosch on
We are working on a project that has a chilled water plant that consists of variable speed chillers and pumps with associated VFDs. Both the integrated chiller controls and the pump VFDs