Forum quick links
Can rainwater reuse system meet the requirment of this credits?
EBOM-v4.1 SSc1:Rainwater Managementposted by XIN CHANG on
Dear LEED experts
Legal Wood -pilot alternative compliance path
Pilot-Credits MRpc102:Legal Woodposted by Dustin Davis on
We are very excited about this new legal wood alternative path and a question has come up during the DD phase.
Requirements for LEEDv4 BD+C Tenant Guidelines
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Helene Lefkowitz on
I am working on a project that will have incomplete spaces that will be finished by tenants.
Campus approach: CHP modeling (LEED v4.1 + ASHRAE 90.1-2016)
NC-v4.1 EAp2:Minimum Energy Performanceposted by Alessandro Zuanon on
Hi,
the project regards a campus (multiple buildings) served by a trigeneration plant (plant producing electricity, heat and chilled water). LEED versione is v4.1.
CI-v4 MRc3 Building Product Disclosure & optimization - Exemplary Performance
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Rachel Bundy on
For exemplary performance of this credit it states;
COVID-19 Impacts
NC-v4 MRc5:Construction and demolition waste managementposted by Joshua Mauldin on
I'm working on a university project and was just notified by our contractor that from February to June their waste hauler took all waste to landfill due to concerns about their employees being expo
Surrounding density question for downtown Houston
CI-v4 LTc2:Surrounding density and diverse usesposted by Anna Kaelin on
Hello,
I am working on a retail store project in downtown Houston. The project is in the mall and I am looking for some help with this credit.
Any reason NOT to switch from v4 to v4.1 for the BPDO EPD credit?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Renee Shirey on
I looked at the changes, and I don't see a reason why the switch to v4.1 would not be of benefit. Am I missing anything, where it could potentially create a problem for a project?
500-year floodplain
ND-Plan-v4 SLLp5:Floodplain avoidanceposted by Marc Mondor on
The v4 reference manual states "locate on a site that is entirely outside any flood hazard area shown on a legally adopted flood hazard map...". For projects without a flood map, it says to l
Asphalt Paving Base Material
NC-2009 MRc2:Construction waste managementposted by Randy Weatherly on
I understand that I can re-use asphalt and concrete paving on the site for this credit, but does this also apply to the 6" type "A" crushed stone aggregate base below these paving types.