Forum quick links
Track light power consumption
Retail-CI-v4 EAp2:Minimum energy performanceposted by Mahesh Shankar on
This one is a retail project in Thailand. The store has many tracklights due to which we are not able to get the required power savings in lighting.
Energy modeling, Chiller at AHRI conditions
NC-2009 EAp2:Minimum energy performanceposted by Santiago Sánchez Sánchez on
Hi,
I’m modeling a building which has water-cooled chillers.
Submitting evidence in design or post-construction stage
NC-v4 EQc9:Acoustic performanceposted by Greenlab on
Hi,
We are in the process of replying to a LEED Certification Review – split review, design stage – of a building which is now close to completion.
Energy Model Room category for server room relevant in baseline building
NC-v4 EAc2:Optimize energy performanceposted by Benjamin Weise on
We're modelling an office building (space by space method) with a relatively big server room (50kW).
Functions of the same product
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Hashir Usman on
Hi all,
Clarification Re. General Emissions Requirement for Multi-part Acoustical Wall Treatment
NC-v4 EQc2:Low-emitting materialsposted by Vanessa Nelson on
We have a project with sound recording studios with drywall throughout and an acoustical wall treatment that will be assembled on site and attached to select portions of the drywall.
Industry-Wide EPD - error in description?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Megan White on
Hi all, In the ref guide (p.514), it states that as part of Industry Wide EPD "the manufacturer is explicitly recognized as a participant by the program operator." However, this is the same exact
Tenant-level energy simulation
Retail-CI-v4 EAp2:Minimum energy performanceposted by Iqbal Khalilullah on
Dear All,
We wish to clarify on the tenant-level energy simulation for our single floor project located within 40 floors of high rise base-building.
Question on who can fill the role of a CxA for enhanced commissioning
NC-v4 EAc1:Enhanced commissioningposted by A.J. Speicher on
Hello. I had a question about who can fill the role as the CxA for the enhanced credit. The case is where an engineering firm was hired by the architect to complete the civil/land devel
Automatic Receptacles LEED Interpretation
NC-v4.1 EAp2:Minimum Energy Performanceposted by Sofia Barahona on
We are attempting to work on a project in LEEDv4.1, which in Optimize Energy Performance states that ASHRAE 90.1-2016 mandatory provisions must be met.