LEED Basement Boundary
Healthcare-v2009 MPR3:Must use a reasonable site boundaryposted by Patrice McVeigh on
Hi, I am working on a project with 3 towers over a shared 2-storey basement. Each tower is being certified separately.
Question Whether Criteria Measures are Appropriate
Pilot-Credits EQpc117:Quality views in nonregularly occupied spacesposted by Kristina Bach on
In pursuing this pilot credit on our project, we wondered whether it was truly appropriate for the pilot credit to require all of the same view criteria measures as typically required in Regularly
LEED v4.1 Renewable Energy Production
NC-v4.1 EAc5:Renewable Energyposted by Ruju Rathod on
We are evaluating the possibility of applying for the Renewable Energy Production credit under LEEDv4.1 for an office building that is receiving renewable energy from the grid.
Exemplary Performance Threshold a Core & Shell Project
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Ben Austin on
Is the threshold for exemplary performance for a CS project 20 EPDs?
Long Term Bike Storage - Distance to Building Entry
NC-v4 LTc6:Bicycle facilitiesposted by Catherine Blakemore on
I this question on the v4.1 forum, but have received an answer and am hoping for better results on the v4.0 forum.
Percent of Males Calculation
NC-v4 WEp2:Indoor water use reductionposted by on
I am struggling to find information regarding how the percentage of males expected to use restrooms with urinals is calculated.
75% compliance within office no longer allows us to count all SF?
NC-v4 EQc8:Quality viewsposted by emily reese moody on
In v3, if 75% of an office complied, we were allowed to include the whole SF of that space in our calcs.
Design or Construction Phase?
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Allison Smith on
Reviewing the credit requirements, I thought that this should be submitted at the Construction phase.