Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

List of items (all possible) to be included in the MRc5 calculation

Healthcare-v2009 MRc5:Furniture and medical furnishings
posted by  Nasir Hussain  on 

To clear out all the confusion (as i can see most of the people are facing the same issue), i just want to know the List of the Items (all possible) to be included in the C

0

List of active Innovation credits?

NC-v4 INc1:Innovation
posted by  RDK E&S  on 

I'm looking for a list of active v4 BD+C Innovation credits to sort through. All the links I've found via Googling aren't active / are broken. Does anyone have a current working link?

2
Sustainability Director, Certifications & Compliance
Jacobs
LEEDuser Expert
470 thumbs up
Tue Feb 18, 2020, 11:27 pm

FTE for Assisted Living Facility

NC-v4 WEp2:Indoor water use reduction
posted by     on 

I am working on a 99 room/6 story assisted living facility in Newport Beach, CA.  The LEED-BD&C v4.0 Reference Guide provided fairly straightforward instructions for determining the "

4
Senior Project Manager
Zinner Consultants
LEEDuser Basic Member
110 thumbs up
Tue Feb 18, 2020, 9:44 pm

v2009 recycled content ranges for steel (BOF / EAF)

NC-2009 MRc4:Recycled content
posted by  Lou Niles II  on 

I am curious to revisions and changes that may be present for LEED version 2009 with Steel manufacturers that claim their products are a Mix of BOF and EAF processes.

2
Tue Feb 18, 2020, 9:06 pm

Land Trust Alliance Alternative

NC-v4 SSc2:Site development - protect or restore habitat
posted by  Ashley Wisse  on 

The project is on a campus that contains a large bird sanctuary that is managed by the Owner, which is open to the public for passive recreation.  This wildlife sanctuary is not part of the La

0

Question on Table 6.5.3.1.1B of ASHRAE 90.1-2010 - How is prssure drop of the Air Heat recovery system of the base calculated?

NC-v4 EAc2:Optimize energy performance
posted by  Stephan Zweig  on 

Please give me a feedback if I have calculated right the Fan Power of the baseline building.

3
Tue Feb 18, 2020, 2:53 pm
2
Tue Feb 18, 2020, 7:27 am

Opportunity for "Salvage"

Pilot-Credits EQpc44:Ergonomics approach for computer users
posted by  Kath Williams  on 

On many projects, the owners simply think of bringing furniture from previous office to save money.  This pilot credit gave one owner the opportunity to look throughout the corporation and fin

0