Space Usage Calculator - Lease Type?????
CS-2009 PIf3:Occupant and Usage Dataposted by Edgar Arevalo on
What does LEED/USGBC define as net and gross lease type?? I have no prior knowledge of the difference between either lease types, and yet the space usage calculator has that column which I ne
Exterior Lighting control for 24x7 operating building
NC-v4 EAp2:Minimum energy performanceposted by Rathnashree Bharadwaj on
We have a commercial building which is 24x7 operating.
Default Emissions Factors & Carbon vs Electricity
CI-v4 EAc6:Green power and carbon offsetsposted by Tracy Marquis on
I have two questions.
Timing of Installation and Commissioning
NC-v4 EAc5:Renewable energy productionposted by Michaella Wittmann on
The LEED Credit template for this credit indicates that the renewable installation has to be complete and commissioned prior to building occupancy.
Flush for Residential Multifamily several stories
NC-v4 EQc4:Indoor air quality assessmentposted by Sue Bryant on
The reference guide states that "If multiple, discrete HVAC systems operate independently, the team may flush out portions of the building as work is completed in each area served by a given system
JUST Disclosure: Internal Communications
Pilot-Credits IPpc90:Social equity within the operations and maintenance staffposted by Allison Wilson on
Less a question and less specific to how to document IPpc90, my organization has just published its JUST disclosure and has embarked on an internal communications program to increase the impact thi
Timing of water testing
NC-v4 WEc3:Cooling tower water useposted by matt kaye on
Do you test the potable water anytime? or should the testing of the water be done after cooling tower start up process?
No refrigerants used in project
NC-v4 EAp4:Fundamental refrigerant managementposted by Michael Cerom on
Hi, maybe this question could also apply to the Enhanced Refrigerant Management Credit,
Permanent walk-off mat
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Summer Gorder on
Can a 10'-0" permanent walk-off mat comply for the entryway requirements, and if so what would be the required weekly maintenance?
LEED and Safety Officer Duties and Responsibilities
CS-2009 MRc2:Construction waste managementposted by Ann E on
Hi,
I just want to clarify the difference between waste management (specially housekeeping) of LEED and Safety.