Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

LVR wood stain and concrete sealer

CI-v4 EQc6:Interior lighting
posted by  Sue Bryant  on 

How do you find the LVR for these products? 

0

Waste Management Coordinator

NC-v4 MRp2:Construction and demolition waste management planning
posted by  Akshay Padwal  on 

The person (program manager) who is coordinating waste management, do they have to be LEED certified? 

2
LEED Services Director
Group14 Engineering, Inc.
LEEDuser Premium Member
47 thumbs up
Wed Aug 7, 2019, 12:05 pm

Requirements for "Ongoing Feedback Mechanism"?

CI-v4 IPc1:Integrative process
posted by  Renee Shirey  on 

The requirement of "Briefly describe the planned method for gathering feedback on occupant satisfaction. Include information on sample sizes,

1
Tue Sep 3, 2019, 7:08 pm

1 EV charging station for 2 spaces and Vehicle Fueling Capacity per Station

CS-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehicles
posted by  Edgar Arevalo  on 

I was informed that the LEED project in question has 1 charging station and two reserved parking spots.  Am I to assume that this station has two charging cables, one for each spot, or should

5
Energy/Sustainability Engineer
ads ENGINEERS, DPC
LEEDuser Basic Member
21 thumbs up
Tue Aug 6, 2019, 8:12 pm

EQpc44

Pilot-Credits EQpc44:Ergonomics approach for computer users
posted by  Lou Niles II  on 

We pursued this pilot credit on one of our interior projects and did well with only one set of comments.

1
Mon Feb 24, 2020, 8:39 pm

PV panels outside the Leed project boundary

NC-v4 EAc2:Optimize energy performance
posted by  Stephan Zweig  on 

Hello to all Leed User community,

I have following question:

Is it possible for the credit Otpimize enetgy performance to count PV panels that are located outside the LPB?

3
Default Avatar
Civil Engineer
BLPTK Construction
LEEDuser Basic Member
3 thumbs up
Tue Aug 6, 2019, 3:00 pm

LEED for Healthcare

NC-v4 EAp2:Minimum energy performance
posted by  Dave Hubka  on 

Hello Marcus,

Why is there a sliding scale for Healthcare as opposed to New Construction?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Mon Aug 5, 2019, 9:10 pm

All equipment tested as part of commissioning?

NC-2009 EAp1:Fundamental commissioning of building energy systems
posted by  Jill Watkins  on 

I am LEED consultant on a convention center renovation/addition and some team members are asking whether or not all equipment needs to be tested in all modes of operation, or if one of each ty

3
President
AGR Consulting, LLC
LEEDuser Basic Member
14 thumbs up
Mon Aug 5, 2019, 5:47 pm