Forum quick links
Software for Energy Modelling
NC-v4 EAc2:Optimize energy performanceposted by Andrea Valentini on
Hello.
I'm working on a project in Italy and evaluating to buy a new BIM software.
Is there anyone who knows if it's possible to analyze our building with a proper BIM SW?
Shared walls with another structure in baseline and proposed
NC-v4 EAc2:Optimize energy performanceposted by Christine McKinley on
Hello,
In my baseline model, can I show shared walls as exposed to exterior and then in my proposed model treat that wall as a partition?
Major renovation to existing building - EQp1 requirements
NC-v4 EQp1:Minimum indoor air quality performanceposted by Navisa Jain on
We have a 6 storey addition to an existing 4-storeyed building. The mechanical systems for the addition are separate from the existing systems.
Time Based Sensor Flash Valve for Dual Flash
NC-2009 WEc3:Water use reductionposted by Orçun Özhelvaci on
We have a project where we can only use Flash Valves for WC instead of Reservoir.
Metering make-up water for geothermal system
NC-v4 WEc4:Water meteringposted by Daniel Davis on
We are installing a meter onto the geothermal well water makeup water (due to evaporation/leakage) – will this count as the additional meter, under process water?
Remediation done by previous owner as part of purchase agreement
NC-2009 SSc3:Brownfield redevelopmentposted by on
If the building owner purchased the building with the remediation done as part of the purchase agreement by the prior owner can they still receive this credit?
Demand Control Ventilation
NC-v4 EQp1:Minimum indoor air quality performanceposted by Ricardo Sá on
Dear All,
Natural Land Cover conditions, option 2
NC-v4 SSc4:Rainwater managementposted by Ricardo Sá on
Dear All,
I have some questions regarding SS C4 Rainwater Management: Natural Land Cover conditions, option 2.
balconies and heat island reduction
CS-v4 SSc5:Heat island reductionposted by Sareet Benayahu on
hello, our project has a large balcony on the second floor of the building.
Option 2: Provide Backup Power for critical loads (1 point) - Back-Up Power Time Duration Table 1.
Pilot-Credits IPpc100:Passive Survivability and Back-up Power During Disruptionsposted by Dionisio Franca on
Back-up power time duration table 1 divides facilities in three categories: