Remediation done by previous owner as part of purchase agreement
NC-2009 SSc3:Brownfield redevelopmentposted by on
If the building owner purchased the building with the remediation done as part of the purchase agreement by the prior owner can they still receive this credit?
Demand Control Ventilation
NC-v4 EQp1:Minimum indoor air quality performanceposted by Ricardo Sá on
Dear All,
Natural Land Cover conditions, option 2
NC-v4 SSc4:Rainwater managementposted by Ricardo Sá on
Dear All,
I have some questions regarding SS C4 Rainwater Management: Natural Land Cover conditions, option 2.
balconies and heat island reduction
CS-v4 SSc5:Heat island reductionposted by Sareet Benayahu on
hello, our project has a large balcony on the second floor of the building.
Option 2: Provide Backup Power for critical loads (1 point) - Back-Up Power Time Duration Table 1.
Pilot-Credits IPpc100:Passive Survivability and Back-up Power During Disruptionsposted by Dionisio Franca on
Back-up power time duration table 1 divides facilities in three categories:
Baseline systems exception: A system for the kitchen in all electricity heating source
NC-v4 EAc2:Optimize energy performanceposted by Mohamed Elagiry on
if we have system 6 as The main system which has the electricity as the main heating source, we have an exception for the kitchen according to G3.1.1 b which state to use system 5 or 7 for the
Condo Building with EXTREMELY small units - around 400 sf
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) controlposted by Stacy Smedley on
We are performing blower door tests on a condo project with units as small as 400 sf.
Integrative process charrette and ANSI book
NC-v4 IPc1:Integrative processposted by Kavita K on
Hi all,
We are pursuing a LEED for Schools project and are looking to get the Integrative process credit. Couple of clarifying questions -