Forum quick links
Daylight Sensor and/or Occupancy Sensor
NC-v4 EAp1:Fundamental commissioning and verificationposted by Purva Saxena on
Are primary side-lighted areas to be provided with Daylight Sensor, even though these spaces (conference room, meeting rooms, private cabins with area less than 250 sq.
Wastewater used in cooling tower dilution tank.
ND-v4 GIBc14:Wastewater managementposted by Varunya Jarunyaroj on
In the case that, at least 25% and up to 100% of annual wastewater (recycled water) are used in cooling tower dilution tank for dilution purpose before being discharged to public sewer sy
Office building - Water cooled VRF DES
NC-v4 EAp2:Minimum energy performanceposted by Aravindraj RB on
Hello,
IEQ - Interior lighting control (Scene switch)
NC-v4 EQc6:Interior lightingposted by Aravindraj RB on
Hello,
Advanced Energy Metering in Multi-Family Housing
NC-v4 EAc3:Advanced energy meteringposted by Allison Wilson on
We're working on a dorm project with apartment style units such that it's essentially multi-family housing.
LEED CS 2009 SSc4.3 - Option 1 Preferred Parking
CS-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Nicole Isk on
Dear all,
air renewal in 72 000cubic meters warehouse
Warehouses-NC-v4 EQp1:Minimum indoor air quality performanceposted by Thibaut REMY on
Hello,
I am looking for help with an issue concerning the ventilation requirement EQP1 for a logistic warehouse.
Refurbishing patio furniture
EBOM-v4 MRc3:Purchasing - facility maintenance and renovationposted by Bo White on
The owner has been considering to replace their patio furniture because it looks weathered. They have been researching qualifying furniture but aren't happy with the look.
BPDO EPDs for typically excluded Masterspec divisions (MEP), without adding to costs for BPDO Sourcing of Raw Material?
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Renee Shirey on
Can I gather EPDs for MEP equipment, and NOT be required to include the cost of those products in the calculations for Sourcing of Raw Materials? The Reference Book is clear that "the de