Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Number of Bicycle Racks and Changing/shower facilities

CS-v4 LTc6:Bicycle facilities
posted by  LEED Pro Consultant  on 

We are currently working on a CS building of 146,617 sqm. The calculations according to the Reference Guide requirements, result in 734 racks and 99 shower/changing facilities.

3
Sustainability Coordinator
MSDL Architectes
LEEDuser Premium Member
3 thumbs up
Fri Sep 28, 2018, 7:38 am

SSc6

EBOM-v4 SSc6:Site improvement plan
posted by  Yaretzy Charo  on 

What does it mean by documentation of existing site conditions? 

3
Thu Sep 27, 2018, 9:08 pm

Commerical Kitchen Equipment - App.3 requirements

Retail-CI-v4 EAp2:Minimum energy performance
posted by  Linda Davisson  on 

We have a Market space fit-out that has multiple tenants within the this market space (multiple food vendors and restaurants).

1
Fri Sep 28, 2018, 2:03 pm

LEED for Homes: Midrise Floor Storey limit

Mid-Rise-v4 MPR3:Must comply with project size requirements
posted by  Tim Nabholz  on 

I have a project that is looking at pursuing a LEED certification. The project is a 23 storey residential facility and was wondering if LEED for Homes: Midrise could be pursued.

8
Associate - Sustainability
Integral Group
LEEDuser Basic Member
9 thumbs up
Thu Sep 27, 2018, 6:27 pm

air cooled chiller minimum full load efficiency COP according to LEED

NC-v4 EAp2:Minimum energy performance
posted by  shamim uddin  on 

Please I am looking for the air cooled chiller minimum full load efficiency COP according to LEED. 

1
Thu Sep 27, 2018, 3:34 pm

Asphalt with Recycled content (RAP)

NC-2009 MRc4:Recycled content
posted by  Rick Alfandre  on 

Has anyone used Ashpalt with recycled asphalt?  Reading the forums, it seems it will apply, but I'm having trouble determining what possible percentage of recycled content (pre or post consume

2
Wed Sep 26, 2018, 7:27 pm

Electric Showers

NC-v4 WEp2:Indoor water use reduction
posted by  Cathal Heneghan  on 

Hi all

How do we evaluate electric showers since their flow rate will vary on water temperature? 

1
Fri Mar 8, 2019, 6:01 am
2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Wed Sep 26, 2018, 12:03 pm

Heat pump with apx 4 kg of refrigerant

NC-2009 EAc4:Enhanced refrigerant management
posted by  Maria Porter  on 

Hi!

I can see that similar questions have been asked before, but I can’t find any answers:

0

Humidification Plant load

NC-2009 EAp2:Minimum energy performance
posted by  SAMY Chamy  on 

Dear All:-

We have large manufacturing facility with Humidification plant & Chiller

1
Wed Sep 26, 2018, 1:34 pm