roof definition
NC-v4 SSc5:Heat island reductionposted by Gerren Wagner on
In the LEED certification glossary, a definition for roof is not given. Previously in v3, roof was defined as area covering occupiable space. For a v4 project, could roof areas that cov
software available to analysis LCA
NC-v4 MRc1:Building life-cycle impact reductionposted by Prakash Sekar on
What are the software available to analysis LCA credit
90.1-2010 Minimum Equipment Efficiencies
CS-2009 EAc1:Optimize energy performanceposted by Tom Nichols on
I have an interesting situation. I am looking to model a 60 ton (720,000 Btu/hr) WSHP. The tables 6.8.1 in 90.1 do not identify the efficiency ratings for a WSHP in cooling or heating m
EAp2 Option 2 - 50% watts in Energy Star no longer required?
Hospitality-NC-v4 EAp2:Minimum energy performanceposted by Gail Napell on
we're doing a hotel. Owner's preferred guestroom mini-frig is NOT Energy Star compliant (as you know, many appliances that used to be Energy Star no longer are under new requirements).
Reusing existing concrete slabs
NC-2009 MRc3:Materials reuseposted by Laura Rebbe on
We are maintaining an existing aircraft hangar floor slab and an adjacent concrete apron for reuse as an equipment parking area.
Air/water-resistive barrier VOC requirement
Schools-NC-v4 EQc2:Low emitting materialsposted by Coral Pais on
Is a fluid-applied air/water-resistive barrier considered a "waterproofing material" which must meet VOC requirements for exterior-applied products?
LEED User Concrete Tracking Form
NC-2009 MRc4:Recycled contentposted by Melanie Blacklock on
Trying to use the LEED User Concrete Tracking Form for the first time to track fly ash. My question concerns Item I: Distances from both harvesting AND manufacturing point to project site (miles).
How to calculated for hybrid urinals
CI-2009 WEc1:Water use reductionposted by Susan Di Giulio on
Sloan has a new "hybrid" urinal that is basically waterless but does a pre-programmed, 1 gallon system flush every 72 hours. This solves a lot of maintenance and odor problems.
What if the project JUST uses only 1ea for each 20 EPD materials?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by J.W. Shin on
Hi,
What if the project JUST uses only 1ea for each 20 EPD materials?
Ready Mix Concrete
CS-2009 MRc5:Regional materialsposted by Ann E on
Hi,
Regarding the mentioned subject, is there/ what papers/certification is needed to submit by the RMC Supplier regarding LEED?
Thank you.