Accessible Floor and Ceiling system

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  roma goyal  on 

Hello,

I would like to know what does "accesible floor and ceiling system" mean?

Does it mean suspended ceiling system and raised floor system for 50% of the total floor area.

0

MLO Non-Residential Lighting using the Performance Method

NC-v4 SSc6:Light pollution reduction
posted by  Candace Cohen  on 

The MLO says that in order to establish the Total Initial Site Lumens one must use Table D, adding together the Allowed Lumens Per Square Foot and the Allowed Base Lumens Per Site.

2
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Tue Jun 26, 2018, 9:23 am

little help about exemple of projects certified as LEED O + M: Existing Buildings

Credit Forums
posted by  ANDREZA PASSOS  on 

Hello, someone could help me, I'm writing my dissertation for university and I'm looking for some projects certified as LEED O + M: Existing Buildings, someone knows where I can find projects with

0

STC ratings of standard materials?

NC-v4 EQc9:Acoustic performance
posted by  Erin Holdenried  on 

Hello - Is there a resource available with published STC ratings for standard/generic materials?

Thanks!

1
Thu Jun 28, 2018, 5:32 pm

Eligible Diversion Materials

Mid-Rise-v4 MRc3:Construction waste management
posted by  Kimberly Vermeer  on 

The waste management contractor for one of my projects is providing reports showing waste going to commingled processing companies.

0

Water Reduction Calculator for non-residential space

Mid-Rise-v4 WEc1:Total water use
posted by  Mugdha Mokashi  on 

The Water Reduction Calculator in the LEED v4_Homes and Multifamily Workbook only addresses the fixtures in units.

1
Wed Jan 16, 2019, 11:47 pm

Timeline issues with "Recycle or Reuse Construction and Demolition Waste"

ND-Plan-v4 GIBc16:Solid waste management
posted by  Ilan Yahav  on 

How can we proceed with this credit in a LEED ND-plan, if there is a requirement to track diverted waste?

1
Mon Jun 25, 2018, 3:59 pm

Rounding Rules for # of Showers or Bike Racks

NC-2009 SSc4.2:Alternative transportation - bicycle storage and changing rooms
posted by  Adrian Arenas  on 

Hello Everyone, 

We have a project with FTE Staff 602, to calculate the showers needed. 602 x 0.005= 3.01 

0

Sharing Commitment for whole-project energy usage data

NC-v4 EAp3:Building-level energy metering
posted by  Asad Yousaf  on 

Dear Fellows;

I need advice. LEED requires letter of Commitment to be signed by the Owner, as its states "Provide a letter from the project owner committing...

7
Fri Jun 22, 2018, 7:41 pm

Minimum energy performance calculator v4 - Peak demand

NC-v4 EAp2:Minimum energy performance
posted by  Fábio Batista  on 

Hi all,

I have a doubt related with the Minimum Energy Performance Calculator for v4. 

3
Default Avatar
LEED Coordinator/Construction Administrator/Business Development
Building Solutions Group, Inc.
LEEDuser Basic Member
47 thumbs up