Forum quick links
Recent toilets, old building
CI-v4 WEc1:Indoor water use reductionposted by Erika Roy on
Hello,
We are working on a CI project that changed the toilets only few years ago with 6lpf. Less than 3 years.
Innovation Catalog: Demand Response
CI-2009 IDc1:Innovation in designposted by Margaret Montgomery on
I'm working on a CI project that encompasses nearly all of an office building that is owner-occupied and part of a larger campus.
Laminating Adhesives applied off-site
NC-v4 EQc2:Low-emitting materialsposted by Catalyst Partners on
For the laminating adhesives, v2009 required all laminating adhesives on and off site to contain no urea-formaldehyde.
Air Testing before Occupancy for phased move-in
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Karl Heitman on
How does LEED interpret occupancy date?
Is Energy Recovery Mandatory?
CS-v4 EAp2:Minimum energy performanceposted by Cathal Heneghan on
Hi all
Can you confirm if Energy Recovery per 6.5.6.1 is a mandatory requirement for the proposed building?
Thanks
waste due to flooding
CS-2009 MRc2:Construction waste managementposted by Nicole Isk on
Dear LEEDers,
Baseline case system selection- Exception
NC-v4 EAp2:Minimum energy performanceposted by Manikandan S on
Hi All,
IAQ Testing
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Kelly Searle on
I am working on a major renovation project - 11 story office building.
Metered Faucets w/less than 12 Sec Duration
NC-2009 WEp1:Water use reductionposted by Michelle Rosenberger on
I have received my second metered lav faucet submittal with less than 12 sec from factory duration.
Does economic analysis to forgo DES phaseout apply in V4?
NC-v4 EAp4:Fundamental refrigerant managementposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on
In the 2009 Reference Guide, an alternative path that allows foregoing DES plant replacement through an economic analysis that shows DES replacement is economically unfeasible is clearly stated.