Forum quick links
absence of material in a category
NC-v4 EQc2:Low-emitting materialsposted by Jens Apel on
What if there is no material in a certain category, e.g. composite wood?
Preferred Parking Requirement
CI-v4 LTc5:Reduced parking footprintposted by Patty Lloyd on
For our project, 60% below baseline for our building type would be 30.33 parking spots.
APPA custodial audit
EBOM-2009 IEQc3.2: Green cleaning - custodial effectiveness assessmentposted by Minh Le on
How to calculate the average score for space type ?
Data Center Minimum Requirement of 2%
NC-v4 EAp2:Minimum energy performanceposted by Amine Zeidane on
Hello,
Ventilation calculation square footage boundary
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Melissa Mikulka on
We have a project that contains a recycle bin storage area within a corridor. Do the exhaust calculations have to include the entire corridor space or can we designate an area around the
Recertification - Survey - How Often?
EBOM-v4 LTc1:Alternative transportationposted by Michelle Bracewell-Musson on
Hello,
Pre Fab Building Compliance
NC-v4 EQc2:Low-emitting materialsposted by Kristen Magnuson on
Is it still possible to get 3 points for 5 compliant credit categories, if the building is entirely constructed off-site and then brought to the site and assembled?
LEED AP + Independent CxA
NC-v4 EAc1:Enhanced commissioningposted by Mike D on
If a team is appointed as LEED AP on a project, can they also act as the independent commissioning agent (the team has not design or construction contract)?
Baseline: existing heat pumps, new FCs
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
I'm modeling a commercial building that has 7 conditioned floors and is heated and cooled by 3 electric heat pumps. According to TABLE G3.1.1A the baseline model should be a System 8.
Outdoor air
NC-v4 EAp2:Minimum energy performanceposted by Emmanuel Pauwels on
In exception C in section G3.1.2.6 Ventilation, it states that 'If the minimum outdoor air intake flow in the proposed design is provided in excess of the amount required by the rating authority or