Server Virtualization Documenation

Data-Centers-NC-v4 EAp2:Minimum energy performance
posted by  Annie Levan  on 

Hello, I have a client that will be using server virtualization for their new data center but does not wish to share the server product information.

1
Wed Mar 7, 2018, 11:19 pm

What is the base building service water?

CI-v4 EAc3:Advanced energy metering
posted by  JASON NIEN  on 

In the LEED CI V4 standard. Base building service water heating does not need to be metered.So someone can tell me what kind of use belongs to base building service water, thanks advance.

1
Thu Mar 8, 2018, 4:50 pm

water consumption calculations for Irrigation

CS-2009 WEc1:Water efficient landscaping
posted by  Selvarasu M  on 

Hi,

The following are the queries with respect to irrigation calculations:

0
1
Tue Mar 6, 2018, 4:19 pm

Interior Lighting Controls - Daylighting Controls

CI-v4 EAc2:Optimize energy performance
posted by  Michael Archer  on 

The credit states the following: Install daylight-responsive controls in all regularly occupied daylit spaces within 15 feet (4.5 meters) of windows and under skylights for at least 25% of

1
Wed Mar 7, 2018, 11:08 pm

Demolition includes Mechanical and Electrical equipment

NC-v4 MRc5:Construction and demolition waste management
posted by  Jeff Ross-Bain, PE, LEED Fellow, WELL AP  on 

Assume a building to be demolished has large HVAC equipment and electrical gear, etc., and is not being reused but discarded.

1
Tue Mar 6, 2018, 3:16 pm

ventilation chimneys for buffer space

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Francesco Passerini  on 

The corridors are separated from the staircase by two doors in order to create a space (buffer space) whose walls and doors are fire-resistant.

3
Mon Mar 5, 2018, 8:38 pm

Calculating F.T.E. for a police substation

NC-2009 PIf3:Occupant and Usage Data
posted by  Joe Malone  on 

We are working on a police substation that houses two precincts with three shifts per precinct.

1
Mon Mar 5, 2018, 10:34 pm

Permanent entrywway systems - rollout mats?

NC-v4 EQc1:Enhanced indoor air quality strategies
posted by  Keith Robertson  on 

The reference guide includes rollout mats in the list of "acceptable permanent entryway systems." LEED 2009 allowed rollout mats to be used as part of the 10' but treated it as non-permanent.

3
Mon Mar 5, 2018, 6:15 pm