Forum quick links
Server Virtualization Documenation
Data-Centers-NC-v4 EAp2:Minimum energy performanceposted by Annie Levan on
Hello, I have a client that will be using server virtualization for their new data center but does not wish to share the server product information.
What is the base building service water?
CI-v4 EAc3:Advanced energy meteringposted by JASON NIEN on
In the LEED CI V4 standard. Base building service water heating does not need to be metered.So someone can tell me what kind of use belongs to base building service water, thanks advance.
water consumption calculations for Irrigation
CS-2009 WEc1:Water efficient landscapingposted by Selvarasu M on
Hi,
The following are the queries with respect to irrigation calculations:
Domestic Hot Water Baseline Equipment Type
Healthcare-v4 EAp2:Minimum energy performanceposted by junaid naseer on
Dear All,
Green-e endorsed carbon offset equivalent
NC-v4 EAc7:Green power and carbon offsetsposted by Conny Waltemath on
Hello - new to the site.
Interior Lighting Controls - Daylighting Controls
CI-v4 EAc2:Optimize energy performanceposted by Michael Archer on
The credit states the following: Install daylight-responsive controls in all regularly occupied daylit spaces within 15 feet (4.5 meters) of windows and under skylights for at least 25% of
Demolition includes Mechanical and Electrical equipment
NC-v4 MRc5:Construction and demolition waste managementposted by Jeff Ross-Bain, PE, LEED Fellow, WELL AP on
Assume a building to be demolished has large HVAC equipment and electrical gear, etc., and is not being reused but discarded.
ventilation chimneys for buffer space
NC-v4 EQp1:Minimum indoor air quality performanceposted by Francesco Passerini on
The corridors are separated from the staircase by two doors in order to create a space (buffer space) whose walls and doors are fire-resistant.
Calculating F.T.E. for a police substation
NC-2009 PIf3:Occupant and Usage Dataposted by Joe Malone on
We are working on a police substation that houses two precincts with three shifts per precinct.
Permanent entrywway systems - rollout mats?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Keith Robertson on
The reference guide includes rollout mats in the list of "acceptable permanent entryway systems." LEED 2009 allowed rollout mats to be used as part of the 10' but treated it as non-permanent.