Forum quick links
Using ASHRAE 90.1-2013 as reference standard for v4 projects
Schools-NC-v4 EAc2:Optimize energy performanceposted by Gail Vittori on
For v4 projects, is there any adjustment in point allocation for projects using 90.1-2013 ILO 90.1-2010?
Excavation material from LEED Project is moved outside the LEED boundary on adjacent land.
NC-2009 SSp1:Construction activity pollution preventionposted by Adrian Arenas on
Hello Everyone
Assessment Influence on Design
NC-v4 SSc1: Site assessmentposted by Summer Minchew on
My question ties back to the FAQ response: "The credit requires that projects assess each feature, but it does not require that every assessment influence the project design." This credit was denie
Any minimum area for Roof after exclusions?
NC-2009 SSc7.2:Heat island effect - roofposted by Orçun Özhelvaci on
Hello,
UL Greenguard Gold Standard version
NC-v4 EQc2:Low-emitting materialsposted by Charline SEYTIER on
Hello,
European ACP for IEQc4.4
NC-2009 IEQc4.4:Low-emitting materials - composite wood and agrifiber productsposted by Josef Andersen on
Hi!
I am unsure if there is an European ACP applicable for IEQc4.4? And if there is, where I can find it?
LEED Addition - use Entryway from Adjoining building?
NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Joyce Kelly on
A two story LEED addition will be regularly accessed from a new stair/elevator tower as well as a corridor at each level that connects it to the existing building.
EV also used as Low-E Preferred parking stall?
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Jill Kurtz on
We have a project using an existing parking lot closest to our building and building a new parking lot as well.
Option 1- Discounted parking: Preferred parking also required?
NC-2009 SSc4.3:Alternative transportation - low-emitting and fuel-efficient vehiclesposted by Erica Downs on
I don't think this is necessary, but just confirming....
For projects using the 20% Discount option, do they also need to provide preferred parking for those vehicles?? Thanks!
20% of occupants vs. 20% of occupants
NC-2009 IEQc7.2:Thermal comfort - verificationposted by Cindy Quinn on
The credit language says "Agree to develop a plan for corrective action if the survey results indicate that more than 20% of occupants are dissatisfied", while the LEEDuser's viewpoi