Forum quick links
MBCx and Advanced Energy Metering
NC-v4 EAc1:Enhanced commissioningposted by Matt Grace on
Is it agreed that a project can pursue MBCx without first achieving Advanced Energy Metering?
Cheers,
Matt
Water Meter Accuracy
CS-v4 WEp3:Building-level water meteringposted by Ciaran McCabe on
For Water meters under LEED V4 is there any requirements in terms of their accuracy ?
LEED CS V4 Design of Snow park
CS-v4 EAp2:Minimum energy performanceposted by Shahana Sayed on
What should be the EAp2 baseline consideration for snow park/ski park within a mall in UAE.
Labelling of waste containers
NC-v4 MRp2:Construction and demolition waste management planningposted by Lise Dannesboe on
Hi.
Envelope & Hazardous Materials
NC-2009 MRc1.1:Building reuse - maintain existing walls, floors and roofposted by Emily G on
Working on a historic renovation of a school building. Two building reuse questions: 1.
OA Monitoring for DOAS serving several HPs
NC-2009 IEQc1:Outdoor air delivery monitoringposted by Logan Dorrell on
For Case 1, Type 2, where at least 20% of the system serves non-densely occupied zones, we have a situation where (1) dedicated outside air system (DOAS) serves several smaller heat pump (HP) zones
CS-v4: Only 1 water subsystem available to be metered, 2nd subsystem proposed to be metered in future. Is this acceptable?
CS-v4 WEc4:Water meteringposted by Mugdha Mokashi on
We are working on a core and shell project which currently has no indoor plumbing fixtures installed. So we have just one sub-system to meter (irrigation).
DES or NO DES?
NC-2009 EAp2:Minimum energy performanceposted by Aru Sau on
In this project, we have one office, two plants signed up for LEED Campus.
Innovation Credit Design for Active Occupants
NC-v4 INc1:Innovationposted by Philippa Cameron on
Hi.