Countries with no Watersense

NC-v4 WEp2:Indoor water use reduction
posted by  Charalampos Giannikopoulos  on 

We are having a difficulty in specifying Watersense labeled flush toilets at projects located in regions where Watersense is not available.

11
Default Avatar
GREEN BUILDING EXPERT
GREENORIX
LEEDuser Basic Member
13 thumbs up
Mon Sep 2, 2024, 8:12 pm
3
Mon Sep 2, 2024, 8:03 pm

SRI value for concrete

EBOM-v4 SSc3:Heat island reduction
posted by  LEED Pro Consultant  on 

Hi, In LEED v2009 BD+C Sustainable Sites Credit 7.1 there is a table with solar reflectance index for standard paving materials, where the typical new gray concrete is 35.

2
Default Avatar
Mr
Green City Associates
LEEDuser Basic Member
0 thumbs up
Mon Sep 2, 2024, 6:45 pm

Heat Island Reduction - Question regarding what qualifies for a "vegetated roof"

NC-v4 SSc5:Heat island reduction
posted by  Philip Hamp  on 

Can an underground building, with an insulated roof and 24inches of fill and turf on top, qualify for a vegetated roof in NC-v4, SSc5?

2
ESG consultant, LEED AP BD+C
Self Employed
LEEDuser Basic Member
36 thumbs up
Mon Sep 2, 2024, 6:10 pm

Does gravel count in "Total Paving Area"

NC-v4 SSc5:Heat island reduction
posted by  Emily Larochelle  on 

Hi, 

I have seen a couple posts about how to count gravel in a nonroof measure. However, I am wondering if gravel counts in the "Total site paving area" of the calculation. 

7
Mon Sep 2, 2024, 6:00 pm

UL Greenguard Gold

EBOM-v4.1 EQc1:Green Cleaning
posted by  Summer Minchew  on 

Do products that have UL Greenguard Gold certification meet the requirements for Products & Materials?

1
Fri Sep 13, 2024, 5:35 pm
7
Sustainable Design Lead
CannonDesign
LEEDuser Expert
378 thumbs up
Fri Aug 30, 2024, 1:17 pm
1
Thu Aug 29, 2024, 12:20 pm

Process loads - plug loads

NC-2009 EAc1:Optimize energy performance
posted by  charles bell  on 

Hello, Under EAc1 my understanding is that the energy model will use a baseline assumption for plug loads.

9
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4461 thumbs up
Wed Aug 28, 2024, 7:21 pm

Plug Load Exemption

NC-2009 EAp2:Minimum energy performance
posted by  Kim Lombard  on 

Has anyone ever gotten or heard about a plug load exemption for projects that demonstrate energy savings but due to extreme plug loads (over 60%) cannot meet the prerequisite 10%?

7
HVAC DESIGN ENGINEER
IES Consulting
LEEDuser Basic Member
17 thumbs up
Wed Aug 28, 2024, 7:20 pm