Slab / Floor Insulation, is it mandotary
Homes-v4 EAp1:Minimum energy performanceposted by Omar Elrawy on
Hi,
For the prerequisite requirement to add R-19 insulation to floor / slab under energystar, is it required on every floor?
Knowing that all floors are airconditioned,
Voltage Drop // mandatory provisions ASHRAE 90.1 - 2010 - ADDENDA 10218
NC-v4 EAp2:Minimum energy performanceposted by Sara BENLOUBA on
Hello everybody,
We are working on a project under LEED V4 certification.
What threshold of reverberation time to apply for Performing arts Space / ballroom?
NC-v4 EQc9:Acoustic performanceposted by Sara BENLOUBA on
Hi everybody,
Airport base ratio ?
NC-v4 LTc7:Reduced parking footprintposted by Bouygues Sustainability on
Hello - how do i calculate the baseline parking capacity of an airport ? - it is not included in the TABLE 1 - Base Ratios for parking spaces, by building type.
Plan de Contrôle d'Erosion & Sedimentation / Storm Water Prevention Plan
NC-v4 SSp1:Construction activity pollution preventionposted by saif eddine majdaoui on
Does the monitoring of SWPP and PCES have to be carried out every week on LEED certification projects even if in the absence of rainy / weather events (No precipitation / no rain)
LEED boundaries for 2 different projects
NC-v4 SSc4:Rainwater managementposted by Mohammed Fadili on
Hello all,
Indoor plumbing fixtures and fittings only?
NC-v4 WEc4:Water meteringposted by Amgad Khattab on
f the only subsystem available in the project is (Indoor plumbing fixtures and fittings), Are we eligible to earn this Credit for a core and shell project?
Source for Table 1 Maximum Parameters
posted by indian tantrik on
Source for Table 1 Maximum Parameters