Warehouse project failed LEED BD+C certification wants to try again
posted by Amine Zeidane on
Hello,
A Warehouse project failed LEED BD + C certification in 2011 and wants to try again in 2018 with the same Building and for minimum cost.
What are options available ?
Flush Out for "During Occupancy" Case of a Major Renovation proj
NC-v4 EQc4:Indoor air quality assessmentposted by Shabari Shaily Gerber on
Our project is an office building undergoing major renovation. The building will remain operational while the renovation is ongoing.
Agricultural land as previously developed land.
ND-v4 SLLp1:Smart locationposted by Kaushaveer Ghoora on
Can we consider land under agricultural use (e.g. surgarcane cultivation) as previously developed land?
A Contradicting Requirement
NC-v4 EQp2:Environmental tobacco smoke controlposted by Tee Howard on
We are currently working on an Airport Project and would like to pursue LEED certification.
ASTM E1903-97 Phase II Environmental Site Assessment - Local Equivalent documentation
NC-2009 SSc3:Brownfield redevelopmentposted by Adrie Fourie on
We are involved with a project outside of the US that undertook a site assessment as part of a legal requirement to decommission a filling station previously operated on site.
Practical implementation of ASHRAE mandatory lighting controls
NC-v4 EAp2:Minimum energy performanceposted by André Harms on
As we are outside of the USA, ASHRAE 90.1:2010 is a new requirement that came with v4 and our designers have no experience in interpreting and applying the mandatory requirements.
Camp Lemonnier - Naval Base in Djibouti, Africa
NC-2009 SSc1:Site selectionposted by Peg Manuel on
We have a dormitory project at a US Naval Installation in Djibouti, Africa.
LEED v4 BD+C - Core and Shell : Renewable energy production
CS-v4 EAc5:Renewable energy productionposted by Spyridon Kostopoulos on
Can anyone clarify for me please if for a Core and Shell certification, the total building energy costs would pertain only to those building installations which the developer controls and not those
Liquid hand soaps/body wash
EBOM-2009 IEQc3.3:Green cleaning - purchase of sustainable cleaning products and materialsposted by Jutta Berns on
We have project that is using a liquid body wash that is technically a liquid hand soap too (purchased as both but in different packaging).
Commissioning required for a CHP?
NC-2009 EAp1:Fundamental commissioning of building energy systemsposted by André Harms on
One of our factory projects is planning on installing a CHP (combined heat and power) plant, with natural gas as the fuel source. Does this system require commissioning?